My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08605
DRMS
>
Back File Migration
>
Revision
>
REV08605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:11 AM
Creation date
11/21/2007 9:55:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Revision
Doc Date
7/14/1993
Doc Name
ADEQUACY REVIEW AMENDMENT TO SLAB CANYON LIMESTONE QUARRY PN 77-347
From
DMG
To
HOLNAM
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Ill 1111111111111111 <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources oc~co~ <br />1713 Sherman SL, Room 215 w. <br />~~ <br />Denver, CO 80203 <br />Phone: (3031866-3567 . ~8j6. ~ <br />FAx: (3071 832-8106 <br />Roy Romer <br />Governor <br />J u 1 y 14 , 1993 Michael B. Long <br />Division Direcbr <br />Mr. Paul E. Thomsen, Plant Engineer <br />Holnam, Inc. ~- <br />P.O. Box 2227 <br />Fort Collins, CO 80522 <br />Re: Adequacy Review, Amendment to Slab Canyon Quarry, File No. M-77-347 <br />Dsar Mr. Thomsen: <br />Listed below are adequacy review comments on the above-captioned permit <br />application. Please submit your responses to the Division by August 10, 1993 <br />so that they may be reviewed by August 24, 1993. <br />EXHIBIT C - Mining Plan Map <br />1. Ackerman Land and Livestock is shown as the surface owner of lands over <br />the proposed amended acreage but land ownership within two hundred feet <br />of all permit boundaries has not been indicated. Please clarify Map C <br />land ownership within two hundred feet of all boundaries. <br />Please include on Map C service/haul roads that will be constructed along <br />the east edge of Phase 2 and extending north into Phase 3. <br />EXHIBIT D - Mining Plan <br />Regarding Phases 3, 4, and 5 the applicant states that more detailed <br />mining plans and decisions cannot be made at this time because <br />exploration drill holes have not been placed in these phases. The <br />Division requests a clarification of whether or not the proposed <br />Reclamation Plan will be applicable to these phases. Will sandstone slab <br />be exposed at approximately the same slope and will this exposure be <br />continuous down the slope of the phases? The applicant should st,bmit to <br />the Division mining methods, erosion control methods, and a timetable for <br />the purpose of establishing the relationship between mining and <br />reclamation during the different phases of a mining operation. Flease <br />note that the operator shall not be required to meet specific dates for <br />initiation, or completion of mining in a phases as may be identified in <br />the timetable (Rule 2.1.2(5) of the Mineral Rules and Regulation<). If <br />this information cannot be provided to the Division at this time, the <br />applicant will be required to submit an amendment before mining is <br />initiated in Phases 3, 4, and 5 in order to provide adequate notification <br />and review of the Mining and Reclamation Plans for these phases. <br />
The URL can be used to link to this page
Your browser does not support the video tag.