My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-12-13_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-12-13_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 12:58:40 PM
Creation date
11/21/2007 9:54:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
12/13/1990
Doc Name
SAN LUIS PROJECT WATER MONTORING PROGRAM
From
BATTLE MTN GOLD CO
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~- • <br />BATTLE MOUNTAIN COLD COMPANY <br />December 13,1990 <br />III IIIIIIIIIIIIIIII ~ <br />Mr. Steve Renner <br />Colorado Mined Land Reclamation Division <br />Centennial Building <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80202 <br />Re: San Luis Project Water Monitoring Program <br />Dear Steve, <br />I . --- ~ ._ r ~:. . <br />-~~'-" <br />B4fILE MOUNWN <br />GOLD COMPANY <br />Battle Mountain Resources has completed baseline analysis <br />of the surface and ground water quality for the San Luis Project. <br />Baseline analyses were conducted in accordance with the schedule <br />and list of parameters included as Tables G.1-3 and G.1-2, <br />respectively, in the original permit application. <br />We request a technical revision for the monitoring schedule <br />and list ofi parameters. The revision would slightly modify the <br />monitoring schedule and parameter list for surface and ground <br />water monitoring station. All other site monitoring would remain <br />as discussed in the approved permit and permit amendment. <br />Enclosed are revised Table G.1-2 and G.1-3 for you review. <br />The changes in water quality parameters include sampling for an <br />addition number ofi parameters semi-annually and fewer parameters <br />during the other two sampling periods. The additional parameters <br />include hardness, ammonia, hydrogen sulfide, and silica, with <br />radium-225, radium-228, lead-210, and uranium ana..yzed as <br />necessary based on the results of the gross alpha and gross beta <br />analyses. The sampling during the remaining two periods will <br />focus on those parameters which classify the water uses; for the <br />existing site waters and/or have established stream stalndard5. <br />The original Table G.1-3 indicated that after the 1'89 water <br />year, quarterly water sampling would occur at all sites except <br />the surface water flow sites. The more frequent monitoring was <br />being performed during baseline monitoring to evaluate temporal <br />shifts in water quality. The data collected to date indicate <br />that significant changes in water quantity or quality do not <br />occur during spring runoff. The revised Table G.1-3 shows <br />quarterly monitoring for all sites. The revision prcposed to <br />reduce flow measurement to quarterly measurements along with the <br />other quarterly sampling. <br />P.O. BOX 310 SAN LUIS, COLORADO 81152-0710 (719) 672-3362 FAX (719) 672-7763 <br />
The URL can be used to link to this page
Your browser does not support the video tag.