My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08326
DRMS
>
Back File Migration
>
Revision
>
REV08326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:58 AM
Creation date
11/21/2007 9:52:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
9/13/1993
Doc Name
SOMERSET MINE FILE C-81-022 TR 18 S-2 MONITORING REDUCTION ADEQUACY REVIEW
From
DMG
To
SOMERSET MINING CO
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIIIIII <br /> 999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />D <br />t <br />t <br />(N <br />l R or~co <br />epar <br />men <br />o <br />atura <br />esources <br />1313 Sherman St., Room 215 R~. ~~ <br />N°i <br />~ R <br />Denver, CO 80203 <br />Phone: 13031866-3567 •ra~s <br />FAX: (703) 832-8106 <br /> Roy Romer <br /> Governor <br />September 13, 1993 Michael B. Long <br /> Division Director <br />Mr. Walter Wright <br />Somerset Mining Company <br />P.O. Box 535 <br />Somerset, Colorado 61434 <br />Re: Somerset Mine, File C-61-022, TR18 S-2 Monitoring Reduction Adequacy <br />Review <br />Dear Mr. Wright: <br />The Division has reviewed both the August 16, 1993 and the August 19, 1993 <br />submittals of application for Technical Revision No. 18 To Permit C-81-022. <br />The Division adequacy comments are listed below: <br />1) Because the monitoring analysis list for S-2 is more comprehensive <br />than the NPDES sampling analysis for outfall Oll (Minewater <br />discharge pond), the limitation of sampling S-2 only when S-1 is <br />flowing can only be approved if a quarterly surface water full <br />suite analysis is conducted on outfall Oll effluent (as described <br />on page 2.04-39a of Permit C-81-022). Please revise the monitoring <br />plan to include this addition. <br />2) The Division agrees with the proposed plan to extend monitoring of <br />Springs 1-11 through June 1994 in order to obtain baseline water <br />quality and quantity data. Somerset Mining Company must commit to <br />not mine within the angle of draw projected downward from the <br />Springs, until this baseline analysis has been conducted and <br />submitted to the Division. Division analysis of the data, and <br />Division approval must also be in place prior to said mining. <br />Sincerely, <br />~~~ <br />Steve S. Shuey <br />Reclamation Specialist <br />SSS/jfg <br />cc: Jim Stover <br />Bear Coal Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.