Laserfiche WebLink
• • III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone: 13031 866-3581 <br />FAx: (7031 866-3589 <br />~3ECEIVEL <br />MAK 2 S 2000 <br />of Oro <br />i <br />H~~'` _ ~~ <br />~. <br />t8T6 ~ <br />hlipl/water state.co.u5/de(aulLhlm <br />Division of Minetal~ & G :o!o:Y <br />Response to Reclamation PernTit Application Consideration <br />DATE: March 28, 2000 <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 5 Office, District 50 Water Commissioner <br />FROM: Jeff Deatherage, P.E. ~D <br />RE: Colorado River Ranch Gravel Pit, File No. M-1981-236 <br />Operator: Raymond Petersen (970) 724-9327, <br />Contact: same <br />Section 11, Twp 1 North, Rng 80 West, 6th P.M., Grand County <br />Bill Owens <br />Governor <br />Greg E. Watcher <br />EMeculive Duecior <br />Hal D. Simpson, P.E. <br />Seale Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamatior., <br />^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the Slate Engineer. <br />^ In the event that ground water is encountered/used, water is currently available for appropriation at this <br />location, thus a well permit may be available without a water court approved plan for augmentation. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for uses at the permit site. Applicant needs <br />to provide evidence to this office that the water is permitted or decreed for such uses. <br />^ Other: <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 3 days. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise the operator will need to make replacements far evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />