Laserfiche WebLink
__~~ <br />iii i iiiiiiiiiu iii <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION NOV No.~" ~ _ ~~ <br />Permit No.: ~_ ~ _ ~~ I <br />Type of Mine: <br />Operator (If Other than Permittee): <br />Mail Address: <br />Mine: 6(I /~ OIL' ~t~'I <br />County: <br />Permittee: t"'G bbd P V'-~ C4N ~~~P,t ~~S Zi~C~ <br />Mai 1 Address: {~ Q, t4ox ,SI 1 my U~ C0.v~ <br />~~ <br />Co . 4 ~ a i. o <br />Date/T'me of //,,IInspection: AA '',n1,A~ <br />Inspector: ~ ~1w- n~~/3 /Q(~ la~~ X1'30 H~rr`~ <br />-~ <br />Person Served: Served B <br />wt~C <br />ignature o person served ignature o authorized representative <br />of Mined Land Reclamation Division) <br />ease prin name an ti a Date and Time of Service: <br />CERTIFIED MAIL N0. P 068 283 026 ~ V 4 V 5 1 ~ ~ ~.~ 1~7 I ~ ~ ~' <br />Return Receipt Requeste <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is ~sCnot ~ expressly, or in <br />practical effect, required by this notice. For this purpose, 'mining" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />55,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />.` <br />