My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06973
DRMS
>
Back File Migration
>
Revision
>
REV06973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:56 AM
Creation date
11/21/2007 9:38:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Revision
Doc Date
12/2/1992
Doc Name
PREMLIMINARY ADEQUACY REVIEW PERMIT RENEWAL BOURG STRIP MINE WALDEN COAL CO FN C-81-021 RENEWAL RN-
From
DMG
To
WALDEN COAL CO
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!.` <br />STATE OF COLLII IIIIIIIIIIIIIIII <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources ~~eof~c~ <br />1313 Sherman St., Room 215 ~~ <br />Denver, CO 80207 <br />Phone: (303) 866-3567 rays <br />FAX: 003) 832-8106 <br />Rav Romer <br />Governor <br />December 2, 1992 Michael B. Long <br />Division Director <br />Kay James <br />Walden Coal Company <br />P.O. Box 229 <br />Boulder, CO 80306 <br />RE: Preliminary Adequacy Review, Permit Renewal, Bourg Strip Mine, Walden Coal <br />Company, File No. C-81-021, Renewal RN-02 <br />Dear Ms. James: <br />The Division has conducted a preliminary adequacy review for the Bourg Strip Mine <br />permit renewal. I have reviewed the following areas and my comments follow. At the <br />present time the only concern that I have is with that Bourg did not submit a standard <br />permit renewal application form. Please fill the enclosed form out and return it to the <br />Division. A copy of the past permit term application form is enclosed. If no changes are <br />required you may use the pages from this application with the exception of pages 1 and 8. <br />If I have additional concerns during my review, prior to the issuance of the renewal, these <br />will be forwarded to you. <br />Bonding <br />The Bourg mine is currently bonded for $214,400.00. This amount remains after the phase <br />1 bond release of $321,600.00 (60% of $536,000.00). The reclamation bond is a corporate <br />surety issued by the St. Paul Property and Liability Insurance Company. The last rider was <br />issued in February 1991. The current bond amottn[ reflecu the minimum bond that the <br />Bourg Strip can have with a phase I bond release. ~~~ ~ opo. bD <br />i <br />Reclamation Liability <br />The current reclamation liability was last calculated October 1989 as part of the phase I <br />bond release. At that time the Division estimated that the phase I bond was sufficient to <br />cover reclamation costs. The Division will review these calculations and determine the <br />reclamation liability for this next permit renewal term. <br />
The URL can be used to link to this page
Your browser does not support the video tag.