My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06967
DRMS
>
Back File Migration
>
Revision
>
REV06967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:56 AM
Creation date
11/21/2007 9:38:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Revision
Doc Date
1/15/1998
Doc Name
FN M-97-058 BASELINE RESOURCE 112C DECISION LETTER-CONDITIONS FINANCIAL AND PERFORMANCE WARRANTY
From
DMG
To
HALL-IRWIN CONSTRUCTION CO
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III {II{111111{11111 ~ STATE CJF COLORP~DO <br />'DIVISION OF MINERALS AND GEOLOGY <br />Dcpanma•nl of Nutural Resources <br />111 1 Sherma n SL, Rre rm ! I S J <br />y` <br /> <br />Denver, Colur, do HI1!111 l <br />~~ <br />Y <br />Vhunr: 11011 H66~ 1567 I II <br />f Ax.110}I H1!~H106 <br /> DEPARTMENT OF <br /> ~ S <br />January l5, 1998 ~•$~tJR <br /> Roy Romer <br /> Governor <br /> lames s. La'hhead <br />Mr. Jeff Gregg t.K°r've nireCror <br /> <br />Hall-Irwin Construction Company rNi°hael B. Long <br />Divnion Director <br />P. 0. Box 519 <br />Greeley, CO 80632 <br />RE: File No. M-97-058, Baseline Resource,112c Decision Letter -Conditions, Financial and Performance <br />Warranty Request -Construction Material Operation <br />Deaz Mr. Gregg: <br />On January 14, 1998, the Division of Minerals and Geology approved your 112c mining permit application. The <br />conditions to the approval are noted below: <br />Stipulation No. Description <br />The operator must do one of the following four options: <br />a. Provide an alternate reclamation plan which shows Phase 2 and 3 as groundwater <br />lakes. The operator will show evidence of compliance with the Office of the State <br />Engineer, Division of Water Resources for this end use prior to exposure of <br />groundwater in Phases 2 or 3. <br />b. Provide a design for the slurry wall done by a registered professional engineer. <br />This design will be incorporated into the permit as a construction quality <br />assurance plan and will be enforceable by DMG. Also, the Operator will provide <br />a monitoring program for construction of the slurry wall to assure i[ is constructed <br />according to plan and will provide a testing program to determine if the slurry <br />wall is constructed properly. The Operator will provide a financial warranty for <br />the amount of 25% of [he construction cost of the slurry wall. Ho groundwater <br />in Phases 2 or 3 will be exposed prior [o final construction of the slurry wall and <br />written acceptance of the construction and quality assurance/quality control report <br />by DMG. <br />c. Provide a financial warranty in the amount sufficient to backfill Phases 2 and 3 <br />with earthen and inert materials in the event that the slurry wall fails. No <br />groundwater in Phases 2 or 3 may be exposed until the financial warranty is <br />provided and approved by DMG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.