My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06704
DRMS
>
Back File Migration
>
Revision
>
REV06704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:44 AM
Creation date
11/21/2007 9:36:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977302
IBM Index Class Name
Revision
Doc Name
TR OWL CANYON QUARRY PN M-77-302
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TE <br />~ ~ iii iiiiiiiiiiiiiiii <br />BRUCE H. LIEN, CHAIRMAN OF THE BOARD <br />SECRETARY - TREASURER <br />ROBERT J. SCHURGER, E%EC. VICE PRESIDENT-MANAGER <br />CRUSHED STONE • HYDRATED LIME • QUICK LIME • ROCK PRODUCTS <br />Office 8 Plant located et Interstate 90 8 Deadwood Avenue <br />Box aao <br />RAPID CITY. SOUTH DAKOTA 57708 <br />TELEPHONE: AC 605/342-7224 <br />TBCHNICAL RHVISION <br />OWL CANYON QUARRY <br />Permit # M-77-302 <br />Pete Lien & Sons Inc. intent to use non- <br />organic material and non-toxic material such as <br />scrap iron (screens) and fines (limestone) in otlr <br />backfill of the quarry highwalls. This material. <br />will be buried to a depth of at least 6' and poe~sibly <br />up to 50' within the existing quarry. There should <br />be no impact on the quality or quantity of ground <br />water at this location. The water table is <br />approximately 160' deep from the fine grind <br />processing plant- <br />Projections at this time are to bury only limited <br />amounts of scrap iron and fines in the backfill. <br />Approximately 1 ton of scrap and 20 tons of fines is all <br />that is generated in an average year's operatiort_ The <br />scrap iron and fines will not be located entirely at one <br />site, instead it will be placed at various placers within <br />the quarry"s backfilled highwalls. Note that tkiis <br />quarry is one mile in length and that the overburden is <br />backfilled across the entire quarry. <br /> <br />puY• 6~me <br />uca® <br />~.~. <br />& Sons, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.