Laserfiche WebLink
PQabody REC~I~l~I~ <br />Twentymile Coal Company <br />JUN 1 0 2005 <br />Memo <br />DIM0011 of Minortl..a*~n .,. ,..,,; <br />To: Byron Walker/CDMG <br />From: Jerry Nettleton <br />Date: June 8, 2005 <br />Re: TR04-44 - As-Built Drawings for 18-Right Cuttings Disposal Pit <br />Byron -Per your phone request, enclosed aze certified as-built drawings for the 18-Right <br />drill cuttings pit. As we discussed on the phone, we aze done with the shaft and aze <br />currently dewatering the cuttings pit. We anticipate allowing the pit to dry out and will <br />then proceed with closure of the pit, including grading the cuttings, wrapping the liner <br />over the cuttings, backfilling and grading the pit, and placing gravel surfacing on that part <br />of the pad. As indicated in your recent letter, we will review both the approved <br />reclamation plans and the SAE and drainage designs to assure compliance as we proceed. <br />Best regazd <br />Jerry <br />