My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03683
DRMS
>
Back File Migration
>
Revision
>
REV03683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:35 AM
Creation date
11/21/2007 9:10:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987040
IBM Index Class Name
Revision
Doc Date
8/9/1996
Doc Name
COSTILLA PIT PN M-87-040 FINANCIAL WARRANTY RECALCULATION
From
DMG
To
SOUTHWAY CONSTRUCTION CO
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j III IIIIIIIIIIIIIIII ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Nawral Resources ~CJ~t <br />-~' ' <br />1313 Sherman Sl., Room 215 /` <br /> <br />Denver, Colorado 80203 <br />J <br />~ <br /> <br />Phone: (3031 866-3567 f <br />l <br />FAX: 13031 8328106 <br /> DEPARTMENT OF <br />NATURAL <br />August 9, 1996 ~S~URCES <br />Ms. Izora Southway <br />Southway Construction Co. <br />117 White Pine Dr. <br />Alamosa, CO 81101 <br />Re: Costilla Pit, Permit No. <br />Recalculation <br />Dear Ms. Southway, <br />M-87-040, Financial Warranty <br />RoY Romer <br />Governor <br />dames 5. Lochhead <br />Eaetulive DIIeC10r <br />Michael B. long <br />Division Director <br />As we had discussed last month, after my recent inspection of the <br />above-named pit, I have recalculated the estimated bond needed to <br />perform the final reclamation of the permit area. The estimate <br />accounts for only the reclamation of the 9.7-acre permit area, and <br />only disturbance which has occurred in relation to your current <br />operation. You are not liable for pre-existing disturbance outside <br />the permit area (which is abundant, as you know) and in-permit <br />areas which have not been affected by this permitted operation, and <br />need not post bond for those areas. <br />My estimate includes all grading, topsoiling, and revegetation <br />necessary to fully bring the area to its approved post-mining land <br />use, by following the plan approved in the file. It is based on <br />the amount of current disturbance and any reclamation already <br />performed. You may influence the total bond by beginning <br />reclamation of some areas. <br />Your present bond is a corporate surety of $5,000.00. The new <br />amount has been estimated to be $11,175.00, reflecting an increase <br />of $6,175.00. The new estimate is enclosed for your review. You <br />may provide the increased bond in the form of a rider to the <br />existing bond, or may submit a new one. If you need any specific <br />forms, you may contact this office, The increase must be submitted <br />within 60 days. Call me if you have questions. <br />Sincerely, <br />~~~ ~~ <br />Bob Oswald <br />Environmental Protection Specialist <br />enclosure: 4-page summary of estimate <br />a:\cor0896,rco/pl <br />
The URL can be used to link to this page
Your browser does not support the video tag.