Laserfiche WebLink
_ III IIIIIIIillllllll ~ ~ <br />Technical Revision on the 11 1/2 Acre Amendment <br />M-77-222 <br />H.L.M. Construction will be using the same type of equipment and mining tech- <br />niques as in the previously approved plan. The acreage will remain the same. <br />The only changes from the previous plan will be the access road and the di- <br />rection the excavation will be worked. <br />Mining will change from South to North to East to West. <br />The access road will be at the east side of the pit connecting to existing <br />road to H. L.M.'s Asphault Plant. <br />The mining time table will be the same. <br />