Laserfiche WebLink
iii iiiiiiiiiiiu iii • <br />STATE OF <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Naluml Resources <br />1313 Sherman St., Room ?15 <br />Denver, Colorado BO?O7 <br />Phone: (303) 866-356: <br />FA%: (3031 AJ2-8106 <br />December 8, 2000 <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />MI NING•SAFETY <br />Dave Long Rill ovens <br />Governor <br />Battle Mountain Resources Inc Greg E. bValcher <br />PO Box 310 Execwive D~reaor <br />San Luis CO 81152 Michael R. Long <br />` j D,vrsion Dbeclar <br />Re: Monitoring Requirement Correction, M-34(POC), San Luis Project, TR=15, {vI-88-112 <br />Deaz Mr. Long: <br />After further review of the groundwater monitoring data for the M-34 POC, it w discovered <br />that lab results have been received for more months than what was outlined in D~IG's November <br />22, 2000 letter. <br />As previously stated, it appeazed that the Division only had lab results for water amples <br />collected in May, June, July, August and September, 2000 at the M-34 point of c mpliance <br />(POC). This is incorrect. The Division has lab results for Mazch, April, May, Jun ,July, August <br />and September, 2000 sampling events. It will only be necessary to collect two m re samples; one <br />in December, 2000 and one in February, 2001. If you have already collected the ctober, 2000 <br />sample (as instructed in the November letter) you will still need to collect the De ember and <br />February samples before initiating your quarterly sampling program in April, 20 1. Sorry for the <br />confusion. <br />After the Division receives the lab report for the February, 2001 water sample, th Division will <br />determine whether there aze sufficient data to determine Permi[ Condition values for this point of <br />compliance. <br />If you have any questions, please give me a call. <br />Sincerely, <br />.James Dillie <br />Environmental Protection Specialist <br />cc: James Stevens <br />