Laserfiche WebLink
Permd : ,rg-T7-4~a Confidental?: <br />Class: ~ ~ Type-Seq.: CIl1- <br />From: dS~ To: <br />Doc. Name: STATE OF COLORADO <br />Doc. Date (if.no date stamp): / o ___-_ <br />OFFICE OF THE STATE ENGINEER DEC 1 4 2004 <br />Division of Water Resources <br />Department of Natural Resources <br />1373 Sherman Street, Room 818 DlVision ~f Minerals and Geology <br />Denver, Colorado 80203 <br />Phone (303) 866-3587 Response to Reclamation Permit Application Consideration <br />FAX (303) 866-3589 <br />www.waterstate.co.us <br />DATE: December 14, 2004 <br />TO: Thomas A Schreiner, Environmental Protection Specialist <br />OF' CO/-0 <br />ye <br />~r~l <br />k k <br />~O~ <br />~ ta76 ~ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CC: Division 6 Office; District 47 Water Commission <br />FROM: Cynthia J. Love, Water Resource Engineer <br />RE: Operator: Jackson County Road & Bridge, B M East Gravel Pit <br />File No. M-1977-472, Revision No. CN-1 <br />Section 20, Twp 9 N, Rng 78 W, 6th P.M., Jackson County <br />Landowner - U.S. Bureau of Land Management <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is reqused. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemrit area or contact this office regazding the <br />600 foot spacing notification hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for:_uses at the permit site, storage in [he excavated <br />area(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />® Other: The application materials do not indicate that any water will be used at the site. Therefore, no water use <br />may occtu during or after mining operations. <br />COMMENTS: <br />