My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03251
DRMS
>
Back File Migration
>
Revision
>
REV03251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:03 AM
Creation date
11/21/2007 9:07:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/13/2001
Doc Name
ROADSIDE MEMO
From
JIM STARK
To
DAN MATHEWS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiiii <br />999 <br />Mathews, Dan <br />From: Stark, Jim <br />Sent: Friday, July 13, 2001 9:28 AM <br />To: Mathews, Dan <br />Subject: RE: roadside memo <br />Dan, <br />Just a quick response to your memo... <br />5. If you look at the support equipment for truck tasks there is a 25°,6 use of a dozer to help load and a 100% of a <br />dozer to spread (dump support). <br />10. I was going by what the AML people told me. The alternative to a bulkhead seal is pushing and packing <br />rock in the opening as a backstop. I am not sure the earth backfill takes this into account. A task for this could be <br />added in lieu of the bulkhead seal. <br />13. I spoke with Mike Boulay this morning and he said the Dso that SEDCAD predicts is the most important <br />component of channel design and that pit run is too much of a wild card to use. <br />If you want I can put these into a more formal memo. Please let me know. <br />--Original Message-- <br />From: Mathews, Dan <br />Sent: Thursday, 12 July, 2001 16:23 <br />To: Stark, Jim; Berry, David <br />Subject: roadside memo <br />the memo you just received from me regarding the roadside cost estimate contained a couple errors. The corrected <br />memo is attached. Please destroy the previous memo. The main change is that the new memo makes no reference <br />to me preparing a letter, it just says I will await feedback before proceeding. <br />« File: 7-12-01 cost estimate memo.doc» <br />
The URL can be used to link to this page
Your browser does not support the video tag.