My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03187
DRMS
>
Back File Migration
>
Revision
>
REV03187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:59 AM
Creation date
11/21/2007 9:06:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Revision
Doc Date
9/14/1994
Doc Name
S/18 INSPECTION REQUIREMENTS
From
HOLNAM
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiniu iii <br />999 <br />SEP 1 a 1994 <br />Fort Collins Plant <br />P.O. Box 2227 <br />Fort Collins. Colorado 80522 <br />4629 N. Overland Trail <br />LaPorte. Coloratlo 80535 <br />303/482-4065 <br />Fax 303/482-1363 <br />HOLNAM INC~ <br />September 13, 1994 <br />Division of Minerals and Geology <br />1313 Sherman Street <br />Denver, CO 80203 <br />Attn: Mr. Gary Curtiss <br />RE: S/1S Inspection Requirements <br />Dear Gary, <br />Attached is a map showing estimates of the the amount of <br />growth media which will be required for the reclamation of <br />the Slab Canyon yuarry. These estimates were made on the <br />basis of a 60-foot width for the loadout benches, and a 16 <br />foot width for the tree pads. The growth media on hoth <br />structures was calculated at 6 inches In depth. <br />Also shown on the map is the• volume of material presently <br />available on the site, and the locations of that material. <br />An area is shown immediately to the east of the entrance of <br />the haul road onto the claims upon which some screened chits <br />and floes were piled during pre-law operation of the <br />property. These chips are being removed on an as needed <br />basis for road maintenance during the winter months. The <br />supply may last a few years. Upon completion of their <br />removal, the area will be cleaned up and seeded. <br />The east boundary line of the c•lalms and permit area as shrwn <br />on the map is that used on the Company base sheets. I ran <br />the actual line during the summer by setting posts b~tw.e.•u <br />the found original claim corner posts. Thts lin•• is v.-ry <br />near that shown on the base maps. The quarry is scheduled tr. <br />be phutogrammetrlcally updated this fall. The claim cnrm~r <br />posts will be flagged for the photography so that any <br />discrepancies will be corrected at that time. <br />If you have any questions ur comments, please. call. <br />V/rlr~trQuly yours, <br />V ~` <br />Paul E. Thomsen P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.