My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03165
DRMS
>
Back File Migration
>
Revision
>
REV03165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:57 AM
Creation date
11/21/2007 9:06:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
12/22/1993
Doc Name
BMRI SAN LUIS PN M-88-112 RESPONSE TO DIVISIONS REQUEST FOR ADDITIONAL REVIEW TIME FOR TR15 16 & 17
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Type & Sequence
TR16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
]°~ III IIIIIIIIIIIIIIII <br />BA'1T1.1: MOl1N1'AlN ItkiSOl]ItCES. INC. <br />December:' 22, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />13]3 Shezma» Street, Room 2]5 <br />Denver, Colorado 80203 <br />}~}~~ ),..\ <br />GOW Cp V <br />Re: Battle Mountain Resources, Inc. (BMh:) - San I~ui.s <br />DMG Permit No. M-88-112 <br />Response to Division's Request for Additions] Review <br />'l'ime for TR-15, TR-16, and TR-]7 <br />Dear Mr. Oehler: <br />On December 20, SMRI received a formal request from tha <br />llivision to extend the decision dates fc7r TR-15 and 7''R-7 c; <br />from January 3 and 4, 1994 to January 74, 1994. Alscl, r>11 ~,~ i~0~ <br />December. ]6, SMRI received a request -from the •Divisiort fclr h'~'wej~~ •h~'"~ <br />additional information and additional review time fur: TR-l~r. ~re+l~ <br />o- <br />TR-15, groutrd water monitoring program, was submittc:cl i.n <br />accordance with TR-o8, Condition 3 which was developed anci <br />approved i.n response to the April 1992 Roard ordered <br />abatement program. Both HMRI and the Division look far•we,rcl <br />to the conclusion of all abatement program issues in tr.lru <br />very near future. As BMRI has an approved monitorinri <br />program in place, revising the decision date for 'PR-1~, t.c, <br />January 14, 1994 is acceptable. <br /> TR-16 was submitted at the request of the Irivisiotr a>: :, <br /> mechanism to incorporate an approved technical specif.i.c;rtiotr <br /> field change of the embankment construction material .int.o <br /> our permit (Division's November 2, 1992 letter); the: <br /> Div.i:rion received information about the constructi.oll <br /> material field change in October (October 1 inspection raid <br /> Interim Construction Report, October ]5). As the DivisiC,ll <br /> is aware, the construction of the main embankment wa.: <br /> completed on December 12. in tnid-October, the Divi:;iorl ~rlcl <br /> SMRI contracted with Water Waste and band (wWL) to provicii: <br /> third party independent engineering oversight for t)!c+ <br /> project and to assist the Division with technical review <br /> issues. As you know, BMRI is currently placing tai]iny~ :..rl <br />/ ~ the facility pursuan <br />to verbal approvals from the Ilivi:~i.arl <br />~r r g <br />and technical oversi ht from WWL. In accordance with <br />Nw~ ,~.~t ~ previous discussions with Mike Long.and others at tt,e <br />;,()p~ <br />"!"""- v.~ Division, AMRI believes it is essential that any and all <br />s ~ lingering issues with respect to the tailings d~sposrll <br />f~.,p._ <br />/~'~~ faci.].ity be resolved expeditiously. BMRI has strcrrtun'c:ci ji.~; <br />o <br />il~l er plans and the schedules of its contractors ,ruder tlr~ <br />l assumption that the review of TR-16 would be comp]et.ed r,ll <br /> schedule. Thus, a delay would adversely affect BMR7'r: <br />DEC 22'93 834 No.002 P.02 <br />A.l'1 ~/l.,/14Ak1'!/f' 11AT'!l.f: AI(lUNlAIN lilf/ll CY1M1'ANI' <br />1'.n. 13bX ?lU SAN LI11ti,lVl.UItA1X> ell}'.UiIU (7 0,672.??Gt FA)i (71'x)6>:~??GJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.