Laserfiche WebLink
~f C~~ DEPARTME•OF NATURAL RESOURCES • <br />R~' ~ O~9 <br />Q. g~ /'3 O D Mome Pascoe ESec Wive Drten or <br />" ~' ~ ~ MINED LAND RECLAMATION DIVISION <br />~. <br />t ~,~=~ ~ • OAVIO C. SHELTON, Director <br />~ /876 s <br />R~U araD Lamm ."""/ <br />Goveinai <br />-_ i <br />T0: Sandy Emrich <br />FROM: Jerry Zimpfer `• ' <br />HE: Foidel Creek Mine, Response to Stipulations #1 and #2 <br />DATE: July 7, 1983 <br />III IIIIIIIIIIIII III <br />I nave completed my review of the Foidel Creek Mine responses to <br />Stipulations No. 1 and No. 2 received June 17, 1983. I have also <br />discussed the response to Stipulation No. 1 with Roy Cox. We both find <br />the operator's response to Stipulation No. 1 to be satisfactory. <br />The operator's response to Stipulation No. 2 does not directly address <br />the stipulation, and it is uncertain whether the response is acceptable. <br />The operator must clarity that water from the wash bay well would no <br />longer be discharged to the stream/alluvial aquifer system. This could <br />be accomplished by discontinuing use of water from the spoils aquifer, or <br />by returning the water to the spoils aquifer following its use. <br />This response should be clarified as soon as possible. If you or the <br />operator have any questions, feel free to ask. <br />/ep <br />cc: Jim Pendleton <br />Roy Cox / <br />Ed Bischoff <br />Doc. No. 4158 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />