Laserfiche WebLink
ail IIIliilllllll III ~ sr ~~'v-~Y ~~~'"s~ <br />999 <br />• LORENCITO COAL COMPANY <br />LORENCITO CANYON MINE <br />PERMIT REVISION #1-PERMIT C-96-084 <br />ADEQUACY RESPONSES FOR JULY 5, 2001 CDMG LETTER <br />Rule 2.03.6 Right of Entry and Operation Information <br />1~. Please submit a copy of the notice Lorencito Coal Company sent to the Hill Ranch/F.E. Hill <br />d~ Co. that triggers the benefits of C.R.S. 34-44-103. (notice to other co-tenants of intention of one <br />co-tenant to mine). <br />Response - A "notice to other co-tenants" of intention to mine is no longer needed. LCC has <br />now obtained a lease from both owners of the coal estate in the 3,142 acres for which permission <br />to mine is sought. See responses to items 2 and 3 below. <br />~k O2. Lorencito Coal Company previously submitted pages of its Coal Lease Agreement with MGP <br />Enterprises. Please submit the signature pages of this document. <br />Response -Attached for inclusion in Exhibit 2 of the Permit is a complete copy of the <br />Memorandum of Coal Lease, executed by MGP Enterprises and by LCC. Please note that the <br />signatures aze on two separate but identical versions of the signature page. <br />p K 3Q. Please provide a copy of [he Hill lease to complete the information in Exhibit 1 of the permit <br />application. <br />• Response -Attached for inclusion in Exhibit 2 of the Permit are copies of the Hil] Coal Lease <br />Agreement and the Hill Surface Use Agreement, with financial information redacted as required <br />by the confidentiality provisions of that lease. <br />Rule 2.04.4 Cultural and Historic Resource Information <br />1~ ~ Please submit the cultural resource survey for the azea proposed to be disturbed by pond 8-2. <br />0 <br />r \~ jo <br />J~ Response -Attached for inclusion in Exhibit 5 of the Permit is a copy of the cultural resources <br />report including the Pond 8-2 area. <br />p`~ SO At this time the SHPO has not provided clearance for the project. The DMG understands <br />that they are awaiting `site forms' and have discussed this with Greystone. If this is not the case, <br />please let us know. <br />Response -All cultural resources site forms have been provided to SHPO under separate cover. <br />~~ <br />( ~`~ <br />~~~ c~5 Sa Please identify [he map and/or report indicating that the P1/P2 haul road corridor has been <br />+ O surveyed and SHPO clearance has been granted. Previous disturbance approval in this area was <br />{~ conditionally approved (see Stipulation #4). If any new alignment of haul road is proposed up <br />1 ~ Lorencito Canyon, all azeas proposed for disturbance will require SHPO clearance prior to <br />• permit approval. <br />