My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-01-17_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2001-01-17_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:20:23 AM
Creation date
11/21/2007 8:54:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/17/2001
Doc Name
3 DAM SEEPWATER COLLECTION PROJECT BACK UP PUMP STATION CERTIFICATION HENDERSON MILL TR TR-09 PN M-7
From
CLIMAX MOLYBDENUM CO
To
DMG
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />© CLIMAX{ MOLYBDENUM COMPANI' "' -'"-'999------- HENOERSON OPEilA710NS <br />A Subsitliary of Phelps Dodge Corporeuon 19302 Coun[y Road 3 <br />Parshall. Colorado 60468 <br />(303) 569-3221 <br />Fax (9701725-0036 <br />~~flolC~ b lC® <br />January 12, 2001 <br />JAfd 1 7 1009 <br />Mr. Allen Sorenson Division of fVlinerals aed DeoloBV <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: 3-Dam Seepwater Collection Project -Back-Up Pump Station CERTIFICATION, <br />Henderson Mill, Technical Revision TR-09, Permit No. M-77-342 <br />Dear Mr. Sorenson: <br />This letter is to provide the Division ofMmerals and Geology (Division) with the last required <br />certification for our new 3-Dam seepwater lines. A certification to the Division stating that the <br />old 3-Dam Seepwater pump station is operational is included with this letter. The Division <br />requested this certification in the 11/14/00-inspection report received from you. <br />The above mentioned inspection report asks for affirmation that both pumps are installed and in <br />working order at the 3-Dam pump station. Per our phone call this week, I clarified that only one <br />pump was rebuildable and reinstalled at the pump station. wth this pump in place, the 3-Dam <br />pump station can fimction as an interim environmental protection facility (EPF). Adequate <br />storage capacity does exist in the 3-Dam seepwater collection ponds to facilitate procuring and <br />installing a 2°d pump if necessary. <br />Please call if you have any questions or are in need of any further information. I can be reached at <br />(303) 569-3221 ext. 2214. <br />Very wly yours, <br /> <br />Erich Bower <br />Environmental Engineer <br />Climax Molybdenum Company <br />Enclosure <br />Cc: Mike Ley -Climax <br />Rich Wagner -Climax <br />Dave Long -Climax <br />
The URL can be used to link to this page
Your browser does not support the video tag.