My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01440
DRMS
>
Back File Migration
>
Revision
>
REV01440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:02 AM
Creation date
11/21/2007 8:52:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Revision
Doc Date
10/13/1995
Doc Name
TEZAK QUARRY AMENDMENT APPLICATION PN M-77-193
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~I I I I~ ~ I~ I I~ ~~~~ ~I~ <br />sss <br />Tezak Quarry Amendment Application, Permit No. M-77-193 <br />RE: Expand quarry operation from 30 to 65 acres; granite <br />Primary Concerns <br />1. Fugitive dust within permitted area - Air Quality permit <br />2. Blasting & offsite impacts to Tunnel Drive residents <br />3. Stormwater management and offsite impacts <br />DMG will recommend conditional approval to the Board on Nov 16, <br />1995 <br />Condition 1. Blasting & Offsite Impacts - DMG will requires that the <br />operator submit within 45 days an application for a technical <br />revision which provides the details of a blasting survey and <br />monitoring program. The blasting survey must define the <br />maximum allowable blast in units of peak particle velocity in <br />which there are no offsite impacts at the Phillip & Collita <br />Smith residence along Tunnel Drive. The blasting <br />monitoring program must identify the location of all proposed <br />blasting monitors and must ensure the submittal of all <br />monitoring data to the Division at least quarterly. <br />Condition 2. Stormwater Management - DMG will require that the <br />operator submit within 45 days an application for a technical <br />revision which provides appropriate Stormwater runoff calculations, <br />engineering designs and plans, as well as all necessary <br />approvals for the conveyance of Stormwater from the Tezak <br />Quarry across Tunnel Drive to the Arkansas River without <br />causing adverse offsite impacts. The revision application <br />must also ensure that all designed structures will be <br />installed and functioning properly no later than March 30, <br />1996. The revision application must include written <br />approvals from the City of Canon City, the Hydraulic Ditch <br />Company, and the Southern Pacific Railroad. <br />Condition 3. The Division will require the operator to notice the <br />objectors and all appropriate parties for each revisien to the <br />amended permit and also provide a copy of each revision application <br />for review at the County Clerk & Recorders Office in Cann City. <br />Condition 4. The Division will require the operator to <br />Cease & Desist from any disturbance in the amendment are•s <br />until the operator has sucessfully demonstrated compliarn~e <br />with conditions 1, 2, and 3, has received approval of an <br />acceptable blasting survey and monitoring program, has <br />received approval of an acceptable plan for safely routing <br />Stormwater offsite to the Arkansas River, and has completed <br />installation of all Stormwater designs, including ditchers, <br />ponds, spillways, culverts, and other structures as <br />necessary. <br />M:\oss\Quarry <br />
The URL can be used to link to this page
Your browser does not support the video tag.