Laserfiche WebLink
_ ~ <br />~ STA~E OF COLC~~~ IIII~~III~~~III~ ~ <br />MINED LAND RECLAMATION DIVISION oF,~o~ <br />Department of Natural Resources N~`/~\~$ <br />1313 Sherman SI.. Room 215 ~I ~ <br />Denver, CO 80203 <br />303 666-3567 ' ' <br />RA x: 303 832-8106 ~ rBie ` <br />Roy Romar, <br />Governor <br />Fretl R. Banta. <br />Division Director <br />July 11, 1991 <br />Mr. Jim Kiger <br />H-G Coai Company <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />RE: Preliminary Adequacy Review, Permit Renewal 02, <br />Hayden Gulch Mine, Permit No. C-80-003 <br />Dear Mr. Kiger: <br />The Division has completed the preliminary adequacy review for the Hayden <br />Gulch Mine Permit Renewal. Since the mine has been reclaimed and it is <br />presently in temporary cessation, we have identified only three concerns <br />as follows: <br />Please update pages in the compliance section of the permit <br />application package so that the permit complies with recently <br />changed Rule 2.03.4. <br />Please submit a technical revision that provides for separate <br />primary and emergency spillways for the explosive storage <br />area, sanitary landfill, maintenance shop and two loadout <br />ponds. From the drawings in the permit document, it appears <br />that all these ponds have culvert outlets which act as <br />combined primary and emergency spillways. I have enclosed <br />a copy of the May 15, 1991 memo which states the D1vlsion's <br />policy regarding combination spillways (Rule 4.05.6(3)(d) <br />and (e). Please also provide two copies of Exhibit U which <br />gives the designs for sediment pond HG-8. <br /> <br />