Laserfiche WebLink
CONTRACTORS <br />ENGINEERS <br />DEVELOPERS <br />~MORRISON-KNUDSEN COMPANY, INC. <br />EXECUTIVE OFFIGE <br />MORAISON~NNUDSEN PLAZA <br />PO BOX )B00/BOISE. IDAHO U S A &1 X29 <br />PHONE'pOBl 98G5000/TELE %. 368n39 <br />October 8, 1987 <br />Ms. Karen A. Hellner <br />Reclamation Specialist <br />MINED LAND RECLAMATION DIVISION <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Subject: A~nllcation for Phase I Bond Releasefor Phase I Bond Release <br />Dear Ms. Hellner: <br />III IIIIIIIIIIIIIIII <br />tl <br />OCT 13 1981 <br />MINED LAND <br />RECLAMATION DIVISION <br />Enclosed are revised bonding calculations pertaining to the partial bond <br />release request submitted by Yampa Mining Company on September 11, 1987 <br />for the Hayden Gulch Mine. Also enclosed are excerpts from the January, <br />1985 Technical Revision which address reclamation cost calculations. <br />The dollar amount requested for release is $854,993. To summarize, this <br />amount was determined by using the costs from the Mine Summary (January, <br />1985 Technical Revision) minus costs associated with facilities removal, <br />and topsoil replacement and revegetation of the 16 acres associated with <br />the shop/facilities area. Sixty percent (60%) of this amount is requested <br />for release. <br />Page 5 of the bond release application has been revised to reflect <br />corrected addresses for E. C. Hills and the Colorado Springs National <br />Bank, both adjacent property owners. Three copies are included for <br />insertion into the application. <br />Please contact me if you have any questions or require additional <br />information. <br />Sincerely, <br />~~ /d ~Ec?~tf <br />Gloria Beattie <br />Design Engineer Specialist <br />Mining Division <br />GB:~ls <br />Enclosures <br />cc: R. Atkinson <br />F. Van Ryn <br />3371h <br />