Laserfiche WebLink
.. _,~ <br />PEABODY <br />,WESTERN <br />~~~ I~II~~I~~IIIII~~ <br />Peabody Western Cool Company <br />Ms. Janet H. Binns <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />~ipq~~~~~'~O <br />~;,.,~: <br />~., ~ ~g9 <br />,• ;. <br />- G~'c <br />'~n,, <br />April 25, 1994 <br />RE: Quarterly Sedimentation Pond Inspections - Hayden Gulch <br />Loadout <br />Dear Ms. Binns: <br />Enclosed is the first quarter inspection for Ponds 001 and 002 <br />at the Hayden Gulch Loadout. All conditions appeared stable and <br />acceptable. <br />If you have any questions, please call me. <br />/~Sincerely,~ <br />Thomas J. Wainwright, P.E. <br />Senior Engineer <br />bd <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />Peabody Western Coal Company • 1300 Sough Yale Street • Flagstaff, Niaona 86001 • Tabphons (607) 774-3253 • Fax (604) 77J-4596 <br />