My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31215
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:54:58 PM
Creation date
11/21/2007 1:23:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Hydrology
Doc Date
11/30/2005
Doc Name
3rd Quarter Sedimentation Pond Inspection Report
From
George Patterson
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECEIVED <br />QUARTERLY SEDIMENTATION POND INSPECTION REPO OV 3 0 2005 <br />CDMR Rule 4.05.6(17) <br />Oivisnn of Nt~n"9ra1~ anE GaologY <br />Mine: Southfield <br />NPDES ID. No.: Pond #4 <br />Inspection Period: Third Quarter, 2005 <br />Inspection Date: September 30, 2005 <br />General Description or Reference to Site Plan: <br />This pond is located on the rrorth east comer of the refuse disposal area. It is a sediment control <br />faalify receiving run-off from the refuse disposal area. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1 j. Adequacy of the vegetative cover: <br />2). Erasion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Exceften Moderate Few Poor <br />Extensive Some ~ None <br />4). Erosion of the downstream tce of the embankment? <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could th~ seepage pose potential instabitiq/? <br />Yes <br />Yes <br />Yes <br />Yes <br />®pr <br />No ~ <br />No ~ <br />No , _ <br />No ~ <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). is the inlet tree of debris and restrth6ve material? <br />3). Is the discharge outlet free of restrictive materiaY? <br />4). Is erosion oxurting at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes Y No <br />Yes v- No <br />Yes i__ No <br />Yes No ,/- <br />Just starting None <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.