Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 ~ <br />Phone (303) 866-3581 Res once to Reclamation Permit A ]cation Consideration <br />FAX (303) 866-3589 P PP <br />wvnv.watecstate.co. us <br />DATE: January 9, 2006 <br />TO: /G. Russell Means, Environmental Protection Specialist <br />OF c~CpP <br />r~ <br />ye0 <br />Y 1896x <br />RECErv ~ol <br />° <br />n= <br />~a ~ <br />~o <br /> <br />JAN 19 20D6 Russell George <br />Executive Director <br />Hal D Simpson PE <br />State Engineer <br />~ivision of Minerals aad Geology <br />CC: Division 5 Offtce; District 39 Water Commissioner <br />FROM: John Redding, Water Resource Engineer <br />RE: Operator: Oldcastle SW Group, Inc. dba United Companies of Mesa County, Glen's Pit, <br />File No. M-2005-075 <br />Section 11, Twp 6S, Rng 93W, 6th P.M., Garfield County <br />Landowner- Glen Chambers <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />® The proposed operation will consume ground water by ®evaporatioq ®dust control, ^reclamation, ^water <br />removed in the mined product, ®processing, ®other: Asphalt and Cement Plant. Prior to initiation of these uses <br />of ground water, the applicant will need to obtain either a gravel pit or other type of well pernil[, as applicable. <br />Prior to obtaining a permit, an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all welts within 600 feet mile of the pemilt area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification hearing process. <br />® The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for: <br />^ Other: <br />COMMENTS: Applicant claims that a substitute supply plan and a gravel well permit will be obtained prior to mining <br />below the water table. Also, an augmentation plan will be promptly filed. <br />