Laserfiche WebLink
Department of NalU rat Recourses FF:Ur ~v~O?\ <br />' <br />~ <br /> <br />13t3 Sherman St.. Room 2t5 <br />Denver. C0 80203 <br />• e t,~t <br />o <br />~ 10 <br />III I VIII I II IIII III NT% + <br />-: ~*/. <br />• <br />• <br />303 866:1567 . ~~~ 4 <br />Fn%: 303 832-8706 <br />~ /876 ~ <br />Roy Romer. <br />Governor <br />Fretl R. Banta. <br />February 8, 1991 Division Drteclor <br />Mr. Dutch Eickenberg <br />Kiowa County <br />P.0. Boy; 591 <br />Eads, Colorado 81036 <br />Re: M-90-148, Gray Pit, Permit Issuance <br />Dear Mr. Eickenberg: <br />On February 5, 1991, the Mined Land Reclamation Division found Kiowa County to <br />have satisfied the applicable requirements of C.R.S. 34-32-101 et seq. for <br />obtaining a mining and reclamation permit. Therefore, a permitis~eing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />de termine~ if a revision to the permit is necessary, Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1,10 to Conversions. <br />3. On ycwr permit anniversary date each year, February 5, you must submit an <br />annual report to us. Please consult C.R.S. 34-32-116(3)-(6) and Rule 3.2(7) <br />for 110 Permits, Rule 2,4 for 112 Permits, and Rule 4.5 for 111 Permits, for <br />the specific annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, ; <br />~ ;r i~-_ <br />~,ii~~/,s~.i , <br />FRED"R. BANTA <br />Director <br />Encl osure <br />1018G <br />