My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72377
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:58 PM
Creation date
11/21/2007 12:16:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
11/10/1986
Doc Name
RUNOFF DIVERSIONS, SEDIMENTATION POND
Section_Exhibit Name
Phase III Stablity Analysis - OV West Portals Design Sheet 6 of 10
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 <br />1 <br />I <br />JiI I <br />0 <br />04 � . <br />J <br />r' <br />.1 <br />d 4 <br />) <br />1A <br />SURFACE <br />LEGEND <br />I I I CREST OF CUT <br />CREST OF FILL <br />48" DIA. CULVERT <br />NOTE: CULVERT AND CULVERT <br />STRUCTURES TO BE DESIGNED <br />BY OTHERS <br />EXISTING GROUND <br />SURFACE CONTOUR <br />t- <br />W <br />W <br />W <br />z <br />z <br />0 <br />Q <br />W <br />J <br />W <br />E <br />PLAN VIEW <br />CLEAN WATER DIVERSION DITCH <br />RUNOFF DITCHES TO SEDIMENTATION POND <br />—� SEDIMENTATION POND SPILLWAY CHANNEL <br />- - - - - - -- RUNOFF FLOW DIRECTION <br />—• —•— - DRAINAGE AREA BOUNDARY <br />E <br />0 5' 10 1 <br />SCALE 1 "= 5 <br />HORIZONTAL AND VERTICAL <br />SECTION E -EI BENCH D <br />;H SECTI( <br />1m <br />11 <br />II <br />11 <br />II <br />i <br />I <br />A <br />7325 -i <br />I- <br />w <br />W I/ <br />? 7 320 -1 <br />i <br />H <br />w <br />J <br />1`J 7315 <br />B <br />7235 -� <br />H <br />w <br />W <br />W <br />z_ <br />z 7230 <br />0 <br />1- <br />a <br />W <br />J <br />W <br />7225 -1 <br />C <br />7175-4 <br />A <br />C' <br />SCALE I" = 5' <br />HORIZONTAL AND VERTICAL <br />SECTION C -C' SEDIMENTATION POND EMBANKMENT - SECTION THROUGH SPILLWAYS <br />D) <br />6 FT. <br />EMERGENCY SPILLWAY <br />3FT. CREST OF EMBANKMENT <br />3 FT. • °• I 2 FT. <br />I L •' 2 � <br />2 ;•• 1 FT. THICKNESS RIPRAP (SEE NOTE) <br />APPROX. 3.4 FT. / <br />PRINCIPAL SPILLWAY 24 IN.DIA. <br />+ CORRUGATED STEEL PIPE CONDUIT <br />RIPRAP NOTE: WHERE GRADIENT OF k <br />SPILLWAY CHANNEL SEEPAGE COLLAR <br />(DOWNSTREAM FROM PRINCIPAL MIN. O.D.6FT. <br />SPILLWAY OUTLET) EXCEEDS 2 %, <br />12" Moo RIPRAP SHALL BE USED D <br />WITH A BED THICKNESS OF 2.0 FT. <br />0 5 1 10 <br />SCALE I "= 5' <br />HORIZONTAL AND VERTICAL <br />SECTION D -DI OF EMERGENCY SPILLWAY <br />COLLUVIAL <br />SOILS 1.5 FT. MIN. <br />0 5' 10' <br />SCALE I" = 5' <br />HORIZONTAL AND VERTICAL <br />SECTION A -AI CLEAN WATER <br />DIVERSION DITCH SECTION (GRADIENT <10 <br />=L= - - 2 <br />1 FT MIN. <br />2 <br />Ir . <br />8 FT. <br />0 5 10' <br />SCALE I"= 5' <br />HORIZONTAL AND VERTICAL <br />SECTION B -B' CLEi <br />DIVERSION DITCH SECTION <br />AI <br />a <br />MSN <br />DATE: 8/17/86 <br />CONCRETE APRON AT <br />SHEET NO. <br />Drawn by: <br />DL <br />10 IN. LONG, CUT IN HALF LENGTHWISE,TACK <br />F, <br />6 OF JO <br />Chocked by: <br />EMERGENCY SPILLWAY <br />INLET <br />Q 17301 WEST COLFAX AVE. SUITE NO.275 <br />WELDED TO RISER PIPE <br />CONDUIT RISER PIPE <br />W <br />GOLDEN,. COLORADO 60401 <br />863 -2032 <br />CREST OF <br />EMBANKMENT <br />EL.7170 <br />EXISTING GROUND <br />SURFACE <br />LL 7170 <br />I <br />i — — <br />— — <br />\ <br />CREST OF EMERGENCY 2 Fr. <br />\ <br />/ <br />8 IN. <br />? <br />i <br />CRESTOF PRINCIPAL <br />SPILLWAY EL.7168.0 <br />3FT. <br />2 %GRADE <br />\ <br />z <br />/ <br />SPILLWAY ELEV.7166.9 <br />I FT. ••.••.; <br />'.Q(Q <br />\ <br />0 <br />MAX.SEDIMENT <br />i <br />ELEV.7165.2 <br />\ <br />2 IN. <br />STORAGE LEVEL <br />OPEN AT TOP <br />10 <br />T <br />AND BOTTOM 2.3 FT. ABOVE BOTTOM OF <br />4 -1.5 IN.DIAMETER <br />2.0 <br />RISER <br />G <br />ELEV.7165.2 <br />ORIFICE HOLES <br />RISER WALL <br />2FT• <br />NOT TO SCALE <br />°:� <br />1.0 <br />\ <br />> 7165 <br />ELEV. 7165.2 <br />_- <br />MIN <br />- <br />W <br />(SEE DETAIL 1 ) <br />J <br />PRINCIPAL <br />SPILLWAY <br />W <br />INVERT EL_ 7162.9 <br />24- IN.DIdM. CSP <br />CONDUIT <br />0 <br />2 /o GRADE - <br />INVERT EL. 7162.1 <br />2 FT M <br />N <br />SEEPAGE COLLARS <br />;:• <br />7160 <br />— <br />POND BOTTOM <br />EL.7160.0 <br />0 5 <br />IFT MIN. THICKNESS <br />D <br />DOWNSTREAM <br />_ <br />(SEE NOTE ON RIPRAP, SEC. D -D') <br />SCALE I" = 5' <br />HORIZONTAL AND VERTICAL <br />SECTION C -C' SEDIMENTATION POND EMBANKMENT - SECTION THROUGH SPILLWAYS <br />D) <br />6 FT. <br />EMERGENCY SPILLWAY <br />3FT. CREST OF EMBANKMENT <br />3 FT. • °• I 2 FT. <br />I L •' 2 � <br />2 ;•• 1 FT. THICKNESS RIPRAP (SEE NOTE) <br />APPROX. 3.4 FT. / <br />PRINCIPAL SPILLWAY 24 IN.DIA. <br />+ CORRUGATED STEEL PIPE CONDUIT <br />RIPRAP NOTE: WHERE GRADIENT OF k <br />SPILLWAY CHANNEL SEEPAGE COLLAR <br />(DOWNSTREAM FROM PRINCIPAL MIN. O.D.6FT. <br />SPILLWAY OUTLET) EXCEEDS 2 %, <br />12" Moo RIPRAP SHALL BE USED D <br />WITH A BED THICKNESS OF 2.0 FT. <br />0 5 1 10 <br />SCALE I "= 5' <br />HORIZONTAL AND VERTICAL <br />SECTION D -DI OF EMERGENCY SPILLWAY <br />COLLUVIAL <br />SOILS 1.5 FT. MIN. <br />0 5' 10' <br />SCALE I" = 5' <br />HORIZONTAL AND VERTICAL <br />SECTION A -AI CLEAN WATER <br />DIVERSION DITCH SECTION (GRADIENT <10 <br />=L= - - 2 <br />1 FT MIN. <br />2 <br />Ir . <br />8 FT. <br />0 5 10' <br />SCALE I"= 5' <br />HORIZONTAL AND VERTICAL <br />SECTION B -B' CLEi <br />DIVERSION DITCH SECTION <br />AI <br />a <br />DETAIL 1 DEWATERI NG DEVICE RISER PIPE <br />GENERAL NOTES <br />1) A SUITABLE PROTECTIVE SCREEN OR TRASHRACK SHALL BE PROVIDED OVER THE PRINCIPAL SPILLWAY INLET. <br />2) ALL RIPRAP SHALL BE COMPOSED OF A WELL- GRADED MIXTURE OF DURABLE ROCK; MOST OF THE STONES SHOULD BE OF <br />DjpO SIZE. MINIMUM RIPRAP THICKNESS SHALL BE AT LEAST EQUAL TO THE D100 SIZE, UNLESS SPECIFIED. <br />RIPRAP SHOULD BE PLACE OVER A SUITABLE GEOTEXTILE FILTER OR FILTER BLANKET OF GRADED GRAVEL IN A LAYER <br />1.5 TIMES THE D100 SIZE. <br />3) CONSTRUCTED HEIGHT OF THE EMBANKMENT SHALL BE 5 PERCENT GREATER THAN THE SPECIFIED DESIGN HEIGHT. <br />4) A SEDIMENT LEVEL INDICATOR SHALL BE PROVIDED FOR MARKING THE SEDIMENT CLEANOUT LEVEL IN THE POND. <br />5) THE POND SHALL BE CONSTRUCTED BY EXCAVATING THE IN -SITU SOILS AND CONSTRUCTING THE DIKES FROM THE <br />EXCAVATED SOILS: NO EXCAVATED (CUT) OR EMBANKMENT (FILL) SLOPE SHALL EXCEED 2(H):1(V). <br />6) RIPRAPPED SPILLWAY DOWN FACE OF THE EMBANKMENT WILL BE OF THE SAME DIMENSIONS AS THE EMERGENCY <br />SPILLWAY AT THE CREST OF THE EMBANKMENT. THE RIPRAPPED CHANNEL FROM THE OUTLET OF THE PRINCIPAL <br />SPILLWAY SHALL CONTINUE AT THESE DIMENSIONS TO A CONFLUENCE WITH EAST ROATCAP CREEK ALONG THE <br />STRAIGHTEST REASONABLE PATH, TO BE DETERMINED AT THE TIME OF CONSTRUCTION. RIPRAP SHALL EXTEND UP <br />SIDESLOPES OF CHANNEL CUTS TO AT LEAST 2 FEET VERTICALLY ABOVE THE TOP OF THE RIPRAP IN THE CHANNEL <br />BOTTOM. <br />7) TWO FEET OF 12 -INCH D100 RIPRAP SHALL BE PLACED ON POND SLOPES WHERE CHANNELS ENTER THE POND. <br />SUFFICIENT NATURAL BOULDERS AND COBBLES WILL BE PLACED AT THE JUNCTION OF THE CLEAR WATER DIVERSION <br />DITCH, THE SPILLWAY CHANNEL, AND EAST ROAT CAP CREEK TO PREVENT EROSION OF THE CREEK BED. <br />8) RUNOFF DITCHES FOR THE TOPSOIL STORAGE PILE ARE THE SAME CONFIGURATION AS SECTION B -B', EXCEPT THE <br />BOTTOM WIDTH IS 4 FEET. SUFFICIENT 12 -INCH D100 RIPRAP SHALL BE PLACED AT CULVERT ENTRANCES AND <br />EXITS, AND AT THE JUNCTION OF THE RUNOFF DITCH AND BENCH �DITCH <br />TO PREVENT EROSION AT THESE POINTS. <br />Nov !003 J <br />COLLUVIAL SOILS - �,,,TCAI 9. f <br />_,dig 15888 <br />:T <br />iN.A• �.'ONAI <br />DATE CHECKED REVISION <br />9 -II MSN NEW NOTES (RIPRAP), CHANGE B -B'TO <br />T>10%) 10 -3,7 MSN MOD, FORD TOPSOIL STORA EP AREA <br />RECIJmoim DIVISION <br />COLORADO WESTMORELAND INC. <br />P.O. BOX 1299 <br />PAONIAe COLORADO 81428 <br />eRc-HA b VA 6fLf0S7 POP7,ML.S Dcsi(f&_5 <br />RUNOFF DIVERSIONS, <br />SEDIMENTATION POND <br />Designed by: <br />MSN <br />DATE: 8/17/86 <br />4 -61N. DIAMETER CORRUGATED STEEL CONDUIT, <br />SHEET NO. <br />Drawn by: <br />DL <br />10 IN. LONG, CUT IN HALF LENGTHWISE,TACK <br />241 N. DIAMETER <br />6 OF JO <br />Chocked by: <br />MB <br />CORRUGATED STEEL <br />Q 17301 WEST COLFAX AVE. SUITE NO.275 <br />WELDED TO RISER PIPE <br />CONDUIT RISER PIPE <br />GOLDEN,. COLORADO 60401 <br />863 -2032 <br />004441 <br />I <br />1 <br />/ <br />1 <br />1 <br />i <br />1 <br />/ <br />8 IN. <br />i <br />1 <br />I <br />1 <br />/ <br />- <br />MAXIMUM SEDIMENT STORAGE LEVEL <br />i <br />ELEV.7165.2 <br />2 IN. <br />OPEN AT TOP <br />AND BOTTOM 2.3 FT. ABOVE BOTTOM OF <br />4 -1.5 IN.DIAMETER <br />RISER <br />HOLES, AT 90 0AROUND <br />RISER WALL <br />NOT TO SCALE <br />DETAIL 1 DEWATERI NG DEVICE RISER PIPE <br />GENERAL NOTES <br />1) A SUITABLE PROTECTIVE SCREEN OR TRASHRACK SHALL BE PROVIDED OVER THE PRINCIPAL SPILLWAY INLET. <br />2) ALL RIPRAP SHALL BE COMPOSED OF A WELL- GRADED MIXTURE OF DURABLE ROCK; MOST OF THE STONES SHOULD BE OF <br />DjpO SIZE. MINIMUM RIPRAP THICKNESS SHALL BE AT LEAST EQUAL TO THE D100 SIZE, UNLESS SPECIFIED. <br />RIPRAP SHOULD BE PLACE OVER A SUITABLE GEOTEXTILE FILTER OR FILTER BLANKET OF GRADED GRAVEL IN A LAYER <br />1.5 TIMES THE D100 SIZE. <br />3) CONSTRUCTED HEIGHT OF THE EMBANKMENT SHALL BE 5 PERCENT GREATER THAN THE SPECIFIED DESIGN HEIGHT. <br />4) A SEDIMENT LEVEL INDICATOR SHALL BE PROVIDED FOR MARKING THE SEDIMENT CLEANOUT LEVEL IN THE POND. <br />5) THE POND SHALL BE CONSTRUCTED BY EXCAVATING THE IN -SITU SOILS AND CONSTRUCTING THE DIKES FROM THE <br />EXCAVATED SOILS: NO EXCAVATED (CUT) OR EMBANKMENT (FILL) SLOPE SHALL EXCEED 2(H):1(V). <br />6) RIPRAPPED SPILLWAY DOWN FACE OF THE EMBANKMENT WILL BE OF THE SAME DIMENSIONS AS THE EMERGENCY <br />SPILLWAY AT THE CREST OF THE EMBANKMENT. THE RIPRAPPED CHANNEL FROM THE OUTLET OF THE PRINCIPAL <br />SPILLWAY SHALL CONTINUE AT THESE DIMENSIONS TO A CONFLUENCE WITH EAST ROATCAP CREEK ALONG THE <br />STRAIGHTEST REASONABLE PATH, TO BE DETERMINED AT THE TIME OF CONSTRUCTION. RIPRAP SHALL EXTEND UP <br />SIDESLOPES OF CHANNEL CUTS TO AT LEAST 2 FEET VERTICALLY ABOVE THE TOP OF THE RIPRAP IN THE CHANNEL <br />BOTTOM. <br />7) TWO FEET OF 12 -INCH D100 RIPRAP SHALL BE PLACED ON POND SLOPES WHERE CHANNELS ENTER THE POND. <br />SUFFICIENT NATURAL BOULDERS AND COBBLES WILL BE PLACED AT THE JUNCTION OF THE CLEAR WATER DIVERSION <br />DITCH, THE SPILLWAY CHANNEL, AND EAST ROAT CAP CREEK TO PREVENT EROSION OF THE CREEK BED. <br />8) RUNOFF DITCHES FOR THE TOPSOIL STORAGE PILE ARE THE SAME CONFIGURATION AS SECTION B -B', EXCEPT THE <br />BOTTOM WIDTH IS 4 FEET. SUFFICIENT 12 -INCH D100 RIPRAP SHALL BE PLACED AT CULVERT ENTRANCES AND <br />EXITS, AND AT THE JUNCTION OF THE RUNOFF DITCH AND BENCH �DITCH <br />TO PREVENT EROSION AT THESE POINTS. <br />Nov !003 J <br />COLLUVIAL SOILS - �,,,TCAI 9. f <br />_,dig 15888 <br />:T <br />iN.A• �.'ONAI <br />DATE CHECKED REVISION <br />9 -II MSN NEW NOTES (RIPRAP), CHANGE B -B'TO <br />T>10%) 10 -3,7 MSN MOD, FORD TOPSOIL STORA EP AREA <br />RECIJmoim DIVISION <br />COLORADO WESTMORELAND INC. <br />P.O. BOX 1299 <br />PAONIAe COLORADO 81428 <br />eRc-HA b VA 6fLf0S7 POP7,ML.S Dcsi(f&_5 <br />RUNOFF DIVERSIONS, <br />SEDIMENTATION POND <br />Designed by: <br />MSN <br />DATE: 8/17/86 <br />Golder Associates <br />SHEET NO. <br />Drawn by: <br />DL <br />CONSULTING GEOTECHNICAL ENGINEERS <br />6 OF JO <br />Chocked by: <br />MB <br />SCALE: AS NOTED <br />Q 17301 WEST COLFAX AVE. SUITE NO.275 <br />Approved by, <br />GM <br />GOLDEN,. COLORADO 60401 <br />863 -2032 <br />004441 <br />
The URL can be used to link to this page
Your browser does not support the video tag.