My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71469
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:44 PM
Creation date
11/20/2007 11:52:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Permit File
Doc Date
11/4/1993
Doc Name
RECEIPT OF FINANCIAL AND PERFORMANC WARRANTIES 83 M-92-069
From
DMG
To
TUTTLE APPLEGATE INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, CO 80207 <br />Phone: (3031 866-7567 <br />FAX:(303)832-8106 <br />November 4, 1993 <br />Mr. Gary J. Tuttle <br />Tuttle Applegate, Inc. <br />11990 Grant Street, Suite 410 <br />Denver, Colorado 80233 <br />III Ilillllllllll III <br />COLORADO <br />p° COro <br />,~~4 <br />Mc <br />• revs <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Duxlor <br />RE: Receipt of Financial and Performance Warranties, 83rd Joint Venture <br />Resource, File No. M-92-069 <br />Dear Mr. Tuttle: <br />The Division received the executed copies of the financial and <br />performance warranties for the 83rd Joint Venture Resource permit <br />application referenced above on October 26, 1993. The Division <br />approved the reclamation permit with stipulations for this application <br />on October 23, 1992. <br />Rules 7.2 (2), 7.5 (7) of the Mineral Rules and Regulations of the <br />Mined Land Reclamation Board state that: <br />An operator must submit the Financial and/or Performance <br />Warranties within one calendar year of Board approval of an <br />application for any new permit, amendment or conversion. If these <br />warranties are not received by the Division within this time <br />period, the Board shall hold a hearing to reconsider the previous <br />approval. <br />I regret to inform you these warranties were not received within that <br />time period. Consequently, the Mineral Rules and Regulations stipulate <br />that the Board shall hold a hearing to reconsider the previous <br />approval. <br />In order for the Board to reconsider the previous approval, all public <br />advertisements made and other notices sent in conjunction with the <br />original application will have to be resubmitted; see Rule 2.2 of the <br />Mineral Rules and Regulations. Receipt of these notices and evidence <br />of the publication must be provided before the Board meeting and the <br />required l0 day comment period following the publication of the public <br />advertisement must have expired before the Board meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.