A. WHEN AND WHAT DEPTH OVERBURDEN WALL BE REPLACED IN RELATION TO EXTRACTION. <br />AS EXPLAINED EARLIER IN THIS APPLICATION, THE TOP LIFT OF MATERIAL WITH TOPSOIL AND <br />REMOVED OVERBURDEN WAS MID 1970-S O CONSTRUCTION THERE WAS NO <br />OVERBURDEN EFT AT THAT TIME AND NONE WILL BE AVAILABLE IN THIS OPERATION. <br />B. MAXIMUM GRADIENT OF RECLAIMED SLOPES (HORIZONTAL: VERTICAL). <br />THE FINISHED PIT FLOOR WILL BE EFT COMPARATIVELY LEVEL, AS INDICATED IN THE OVERLOT GRADING <br />AND EROSION CONTROL PLAN. THE ONLY SLOPES WALL BE THE 3H:1V BACKSLOPES ON EITHER SIDE OF <br />THE STRATMOOR HILLS WATER LINE, WHICH CROSSES BOTH THE MIDDLE AND SOUTH PIT. <br />C. MEASURES THAT WALL BE TAKEN TO REVEGETATE THE SITE, IF APPLICABLE. <br />(1) THICKNESS OF THE PLANT GROWTH MEDIUM TO BE REPLACED <br />AS STATED EARLIER, THE TOPSOIL AND OVERBURDEN WERE REMOVED IN THE MID 1970'S SO THERE IS <br />NO TOPSOIL ON SITE. HOWEVER, THERE HAS BEEN SOME NATURAL REVEGETATION, AS SOME HUMUS <br />HAS BUILT UP AVERAGING 4 ", WHICH WALL BE CALLED THE GROWTH MEDIA. THIS MEDIA WALL BE <br />STOCKPILED ON THE PIT PERIMETER FOR REPLACEMENT IN RECLAMATION. FROM THE REVEGETATION <br />THAT HAS OCCURRED IN THE LAST 20 PLUS YEARS, IT APPEARS THAT THIS MEDIA IS ADEQUATE TO <br />SUPPORT REVEGETATION IN RECLAMATION, EVEN THOUGHT THERE IS NO TRUE TOPSOIL ON SITE. <br />(II) TIME OF SEEDING, SEEDBED PREPARATION, TYPE APPLICATION RATE AND SOIL INCORPORATIONS <br />METHOD OF FERTILIZER APPLICATION. <br />SEEDING WALL BE DONE IN THE LATE FALL AS THIS HAS SHOWN THE BEST RESULTS. THE SEEDBED <br />WILL BE SCARIFIED. THE GRASS SEED MIX WILL BE DRILLED. 40#, AVAILABLE N &P WALL BE APPLIED <br />PER ACRE PRIOR TO SCARIFYING THE SEEDBED. <br />(III) STATE THE SPECIES TO BE PLANTED AND THE APPLICABLE QUANTITIES. <br />SPEC E ARIEEISCENT WHEATGRASS 1 1.0 � <br />MANCHARD SMOOTH BROME GRASS 70 4.50 <br />ARRIBA WESTERN WHEATGRASS 15 1.00 <br />40# AVAILABLE N &P WILL BE APPLIED PER ACRE, PRIOR TO SEEDING <br />(IV) APPLICATION METHOD FOR GRASS SEEDING. <br />AS STATED IN (III) ABOVE, THE GRASS SEED WILL BE DRILLED BY A SEED DRILL MTH A COMPETENT <br />AGITATOR AFTER THE AREA IS SCARIFIED AND FERTILIZED. <br />(V) MULCH IF NECESSARY AND METHOD AND RATE OF APPLICATION. <br />STRAW MULCH WILL BE APPLIED AT 4,000#/A AND CRIMPED INTO THE GROWTH MEDIA. <br />(VI) ESTABLISHMENT METHOD FOR EACH SPECIES OF SHRUB OR TREE. <br />NO TREES OR SHRUBS ARE PROPOSED FOR THIS DEVELOPMENT AREA. <br />D. SPECIFY WHICH PONDS, STREAMS, ROADS, AND BUILDINGS WILL REMAIN AFTER RECLAMATION. <br />NO PONDS, STREAMS, OR BUILDINGS ARE ON SITE. ANY ROADS AND STREETS REMAINING WILL BE <br />THOSE INSTALLED BY THE APPLICANT AS PART OF THE DEVELOPMENT PLAN. <br />E. SPECIFY THE RECLAMATION TREATMENT OF ANY WASTE ROCK DUMPS, TAILING IMPOUNDMENTS, <br />UNDERGROUND MINE OPENINGS, DITCHES, SEDIMENT CONTROL FACILITIES, BUILDINGS OR OTHER <br />FEATURES NOT ADDRESSED. <br />SINCE THIS IN AN OPEN PIT SAN AND GRAVEL DEPOSIT, THERE WILL BE NO WASTE ROCK DUMPS, <br />TAILING IMPOUNDMENTS, UNDERGROUND MINE OPENINGS, DITCHES SEDIMENT CONTROL FACILITIES, <br />BUILDINGS OR ANY OTHER FEATURES NOT ADDRESSED IN THIS NARRATIVE INVOLVED IN ANY WAY IN <br />THE OPERATION. <br />1 /Y - 3/4" FkTEA LAYER <br />N.T.S. <br />BALE WIDTH <br />FLiW <br />3. WEDGE LOOSE STRAW BETWEEN BALES <br />2. PLACE AND STAKE STRAW BALES <br />4. BACKFILL AND COMPACT THE EXCAVATED SOIL <br />STRAW BALE BARRIER INSTALLATION <br />N.T.S. <br />Wood or Steel Fence Post <br />(Rebor not allowed) <br />REOL MATION COST OPINION Compacted Soil to <br />Prevent Piping �� y <br />1. GRASS SEED MIX 69.43/A 9.999 A $ 692.71 I I 1 <br />2. DRILLING GRASS SEED 22.00/A 9.999 A 219.97 <br />3. FERTILIZER (40 #/A N &P) 29.23/A 9.999 A 292.27 Sediment Laden 1 <br />4. FERTILIZER APPLICATION 17.50/A 9.999 A 174.98 Runoff <br />5. TOPSOILING W. DOZER OR LOADER <br />MAXIMUM PUSH 250', 4 "/A AVG. 0.75 /CY 5,377 CY 4,032.75 <br />6. REPLACING OVERBURDEN -0- -0- -0- <br />7. SCARIFYING (DISK OR CHISEL) 52.50/A 9.999 A 524.94 <br />8. WEED CONTROL 25.00/A 9.999 A 249.97 <br />9. 0001 /A GRASS, HAY, OR STRAW MULCH 170.00 /A 9.999 A 1,699.83 � \ /� / \� \ \ \ <br />10. SPREAD & CRIMP MULCH 55.00/A 9.999 A 549.94 /� /� /� /� \ / / /� ✓/� m�Mk <br />11. BACKSLOPING (DONE WITH MINING) -0- -0- -0- ' <br />12. MOBILIZATION COST (LUMP SUM) 600.00 600.00 <br />$ 9,034.06 <br />INDIRECT COST 18.5% 1,671.30 <br />ADMINISTRATION EXPENSE 5.0% 535.27 STRAW BALE BA <br />$ 11,240.63 $TI3 <br />N.T.S. <br />ROUNDED TO $11,240.00 <br />EROSION CONTROL COST OPINION <br />SILT FENCE - 2700 LF A $2.00 /LF $5400 <br />STRAW BALE BARRIER - 900 LF ® $1.00/LF $,900 <br />VEHICLE TRACKING - 1 EA A $500/EA $500 <br />RESEEDING (SEE RECLAMATION PLAN) <br />TEMPORARY SEDIMENT TRAPS - 2 EA ® $500 /EA $1000 <br />SUBTOTAL $7800 <br />25% MAINTENANCE AND REPLACEMENT <br />TOTAL $9750 <br />Staked and Entrenched <br />Straw Bole <br />Binding Wire or <br />Twine <br />Filtered <br />Runoff <br />Oa TEMPORARY DIVERSION DIKE <br />N.-.S. <br />:D <br />OR EQUIVALENT SILT FENCE <br />FASTENERS (TYP) <br />, <br />DEEP TRDOCH h <br />POST POST <br />MIRAFI IO0X FABRIC, 13R EQUIVALENT SILT FENCE NIRAFI 100X FABRIC, OR EQUIVALENT SILT FENCE <br />FASTENERS (TYP) FASTENERS I <br />I� I. <br />LAY FABRIC 13N TOP OF GROUND <br />AM FILE FILL MATERIAL ON FAMC- <br />V ` -DIG TRENCH 6• DEEP, LAY IN <br />SILT FENCE FABRIC AND BACKFILL,.(,� v <br />TYPICAL SECTION A SILT CONTROL BARRIER <br />SILT CONTROL BARRIER ALTERNATE METHOD OF INSTALLATION <br />STANDARD METHOD OF INSTALLATION <br />N.T.S. <br />EXCAVATED SEDIMENT TRAP <br />ROCK LINED INLET <br />EMBANKMENT SEDIMENT TRAD <br />IV I <br />C4' MIN. <br />--1 I-"- r1' MIN. <br />1' MIN.- <br />1- MAXIMJM SEDIMENT STORAGE <br />CLEAN =OUT LEVEL <br />(1/2 TOTAL DEPTH) <br />CROSS SECTION <br />DIVERSION DIKE <br />- ORIGINAL GRADE <br />1 MIN. <br />)CK LINED OUTLET <br />-5' MAX. <br />LENGTH (IN FEET) _ <br />1.5 X DRAINAGE <br />AREA (IN AC) <br />ROCK LINING: 9" THICK LAYER OF 6" ROCK ON 3" <br />THICK LAYER OF 1/2* - 3/4" FILTER <br />DIVERSION DIKE CAN <br />JOIN WITH EMBANKMENT <br />ROCK PLACED ON <br />TOP OF IMPERVIOUS <br />EMBANKMENT <br />TEMPORARY SEDIMENT TRAP <br />N.T.S. <br />i � I <br />rn�WO <br />m <br />_j <br />F < W W <br />z9�� <br />I` y <br />c� c F <br />V) F <br />tea: <br />±OO ��' <br />{{ F- <br />l� Q ^^� tt a� <br />I� J `N O CG <br />y�{ <br />O ~ a� <br />m <br />In ~ Cs <br />o� O <br />U ! <br />=a 0' Q <br />00 p© o <br />� U i <br />W I <br />'d ass <br />41 <br />I1.4 b o <br />a� <br />.� 0;. <br />,,�im <br />ri"i j <br />bAD <br />P qer$ <br />Permit Number t'(, 0 <br />Class: eanit <br />Se_ction/Ex i b: ._._._. .......................... <br />Class: 0 Revision �i <br />Tvp?/SeQ _____._ ._____._____._._____._._____._! J y <br />Class: 0 Report 0 Hydro DGeneml O Z <br />Doc Type_ _____________ O <br />DApplication (Coal only) 0 Bond 0 Enforcement 0 Inspection Z <br />1 a o <br />-1 0 o u~) <br />THE DEVELOPER SHALL COMPLY WITH THE REQUIREMENTS PREPARED UNDER MY DIRECT SUPERVISION FOR AND ON BEHALF 0 o o 0 <br />ci <br />OF THIS GRADING AND EROSION COLNTOL PLAN OF JR ENGINEERING, LTD. a 0 w a <br />►- z <br />LLj 08 <br />y <br />Z <br />m 0- o <br />10j i I SHEET 3 OF 3 <br />! � `G <br />` � DA TE <br />JOB N0. <br />R610- <br />OP KYLE R. CAMPBELL. : ' <br />,���,, <br />9145.00 <br />�hrrnll,u,• 5 <br />IN!!! IIII IIIN TIN �N NI IN <br />1198334 334 <br />i <br />I <br />U <br />Q <br />\ <br />Y <br />Z <br />N <br />m <br />m <br />Q <br />X <br />. <br />W <br />U <br />V <br />13 <br />O <br />Permit Number t'(, 0 <br />Class: eanit <br />Se_ction/Ex i b: ._._._. .......................... <br />Class: 0 Revision �i <br />Tvp?/SeQ _____._ ._____._____._._____._._____._! J y <br />Class: 0 Report 0 Hydro DGeneml O Z <br />Doc Type_ _____________ O <br />DApplication (Coal only) 0 Bond 0 Enforcement 0 Inspection Z <br />1 a o <br />-1 0 o u~) <br />THE DEVELOPER SHALL COMPLY WITH THE REQUIREMENTS PREPARED UNDER MY DIRECT SUPERVISION FOR AND ON BEHALF 0 o o 0 <br />ci <br />OF THIS GRADING AND EROSION COLNTOL PLAN OF JR ENGINEERING, LTD. a 0 w a <br />►- z <br />LLj 08 <br />y <br />Z <br />m 0- o <br />10j i I SHEET 3 OF 3 <br />! � `G <br />` � DA TE <br />JOB N0. <br />R610- <br />OP KYLE R. CAMPBELL. : ' <br />,���,, <br />9145.00 <br />�hrrnll,u,• 5 <br />IN!!! IIII IIIN TIN �N NI IN <br />1198334 334 <br />i <br />I <br />