Laserfiche WebLink
III IIIIIIIIIIIII III Doc Date:12/11/2001 <br />• s~~ <br /><< 2.05.3!10) Return of Coal Processing Waste To Abandoned <br />Workings ~~ <br />The temporary coal-processing waste pile will be <br />periodically returned to mined out areas. After coal is mined <br />out of an area, the coal processing waste may be returned to <br />those areas involved in overburden backfiill operations. The <br />amounts of waste generated at processing facilities is not <br />expected to exceed a few yards a month. The waste is expected <br />to consist of shale and rock materials. <br />No effect on active mining operations, surface areas, or <br />the hydrologic regime is anticipated. <br />\_ J <br /> <br />