My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68449
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:04 PM
Creation date
11/20/2007 10:22:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005067
IBM Index Class Name
Permit File
Doc Date
3/15/2006
Doc Name
Response
From
OSE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u/w~ ~~F <br />S ~` STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.waterstate.co.us <br />RECEIVED <br />`/MAR 15 2006 <br />v `Di 'sign of Minerals and Geala~y <br />Response to Reclamation~'ermrt Application Consideration <br />DATE: March 13, 2006 <br />TO: Anthony J. Waldron, Environmental Protection Specialist <br />CC: Division 2 Office, District 66 Water Commissioner <br />FROM: Sarah Reinsel, E.I.T. ,// <br />RE: Carrizo Stone South, File No. M-2005-067 <br />Operator: Carrizo Stone, LLC <br />Contact: Stephanie 8 Ray Sikes, 719-643-5325 <br />Section 9, Twp 33 South, Rng 50 West, 6th P.M., Baca County <br />pF' ~O~ <br />i.F',' k~ <br />Ns <br />ixx <br />k <br />~ i876 f <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpwn, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamation, <br />^ water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />^ The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, the water was diverted in priority under a water right decreed for such industrial use or the use of <br />water was approved by the Colorado Ground Water Commission for such industrial use. <br />COMMENTS: The applicant may contact the State Engineer's Office with any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.