Laserfiche WebLink
<br />iiiiiiiiiiiiiiiiui <br />989 <br />ECG NECA <br />S Coal Company <br />Seneca Coal Company <br />~FCEivEQ <br />APR 0 Fi i995 <br />.iw~sia: v. io~,neims a Ueoiog} <br />Mr. Joseph Dudash <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 60203-2273 <br />April 5, 1995 <br />RE: Quarterly Sedimentation Pond Inspections - Hayden Gulch <br />Loadout <br />Dear Mr. Dudash: <br />Enclosed is the first quarter inspection reports for Ponds 001 <br />and 002 at the Hayden Gulch Loadout. All conditions appeared <br />stable and acceptable. <br />If you have any questions, please call me. <br />EY1C lOSllre (S) <br />c: Fred Fest <br />Dennis Jones <br />Sincerely, <br />~r2,;~r~.a.p.~1. C1.r~,.Q'-~- <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />