LEGEND
<br />GRAPHIC SCALE
<br />( IN FEET )
<br />1 inch = 200 ft.
<br />CONTROURINTERVAL =5'
<br />��
<br /><
<br />�A
<br />INITIAL RECOVERY TO CONSTRUCT
<br />CLARIFICATION BASIN
<br />SUMP /CLARIFICATION BASIN
<br />� (SEE NOTE 5)
<br />� COFFERDAM OR OTHER TEMPORARY
<br />IMPERMEABLEBARRIER
<br />MINING SCHEDULE
<br />SECTION LINE
<br />ACREAGE
<br />PROPERTY LINE
<br />�- - . ___ -
<br />EASEMENT /ROW
<br />C �
<br />PROPOSED EASEMENT
<br />0.10
<br />PAVED ROAD
<br />22,42
<br />1,300,300
<br />----- - - - - ------------------
<br />------------------------------
<br />UNPAVED ROAD
<br />- - - _ - . - - . - .. - .. -
<br />DITCH /WATERWAY
<br />`° " °° ^ °° ^
<br />FLOODPUIN ZONE A
<br />` °' `° " °° c
<br />FLOODPUIN ZONE X
<br />- °w— °w— ' "wFw —� —Fw-
<br />FLOODWAY
<br />'� �' � ��
<br />MINING LIMIT /POND BOUNDARY
<br />'� � � �
<br />PERMIT BOUNDARY
<br />REV
<br />EXISTIN6INDEX CONTOUR
<br />EXISTIN6INTERMEDIATECONTOUR
<br />— ws— sns— ws— 6"s— s•s—
<br />EXISTING6A5 LINE
<br />PROPOSED 6A5 LINE
<br />— orn,— oHU— oHU— oNV— oNU—
<br />EXISTING OVERHEAD UTILITY
<br />- — �
<br />RELOCATED OVERHEAp UTILITY
<br />EXISTING PHONE CABLE
<br />EXISTING STRUCTURE
<br />' v - - =BMW
<br />7URISDICTIONAL WETUNDS
<br />O
<br />MONITORING WEU,
<br />1
<br />DIRECTION OF MINING
<br />GRAPHIC SCALE
<br />( IN FEET )
<br />1 inch = 200 ft.
<br />CONTROURINTERVAL =5'
<br />��
<br /><
<br />�A
<br />INITIAL RECOVERY TO CONSTRUCT
<br />CLARIFICATION BASIN
<br />SUMP /CLARIFICATION BASIN
<br />� (SEE NOTE 5)
<br />� COFFERDAM OR OTHER TEMPORARY
<br />IMPERMEABLEBARRIER
<br />MINING SCHEDULE
<br />PHASE
<br />ACREAGE
<br />RESERVE (TONS)
<br />YEARS TO MINE*
<br />lA
<br />1.72
<br />76,500
<br />0.10
<br />1B
<br />22,42
<br />1,300,300
<br />2.50
<br />2
<br />16.86
<br />829,200
<br />1.75
<br />3A
<br />38.19
<br />1,959,600
<br />4.00
<br />36
<br />24,34
<br />1,262,000
<br />2.75
<br />"bttNUlty
<br />�F"°� w NOTES:
<br />� �
<br />"° � 1. TOPOGRAPHICAL CONTOURS TAKEN FROM U565 SAT COLORADO QUADRANGLE AT 20' CONTOUR INTERVALS IMPLEMENTATION OF CONCURRENT RECUMATION IS REQUIRED TO LIMITNEAR - VERTICAL SLOPES.
<br />AND INTERPOLATED AT 5' CONTOUR INTERVALS.
<br />3
<br />vv ^i ^sue
<br />2. APPROXIMATE DEPTH OF MINED AREA I5 25 FEET WITH 2.5H:IV SIDE SLOPES. THE OPERATOR WILL MINE TO 9 ACTUTALMARKET ONDITIONS AND MINING �LHEOULE MAO VARYND 500,000 TONS l YEAR MARKET DEMAND.
<br />�� � � \ � � _ .. _ � I 2.5:1 SLOPES, OR RECOVERY TO NEAR - VERTICAL SLOPES, WHERE PRACTICAL, GIVEN LIMITED OVERBURDEN ND
<br />\ , / �/ � � . � , � � - � ... _ _ - _ .. _ ... _ ... — LIMITED STOCKPILING FOOTPRINT. OVERBURDEN AND TOPSOA MATERIAL USED FOR SCREENING BERMS 10. ASPHALT AND / OR CONCRETE PUNT FACILITIES MAY BE LOCATED IN THE PHASE 1 / 3 PROCESSING AREAS.
<br />/ �/ � \� ` 1 - I - DURING MINING WILL BE BACKFILL PLACED ALON6SHORELINE CRO55- SLOPES DURING FINAL RECLAMATION THE PROCESSING AREA MAY ALSO CONTAIN TRUCK PARKING, EQUIPMENT STORAGE, AND OTHER ACCESSORY
<br />/' / �� � � �'R., � _ TO ACHIEVE FINAL SLOPES OF 3:1 AND 2:1, AS IDENTIFIED IN THE RECLAMATION PLAN. USES. THIS AREA WILL BE PREPARED BY REMOVING ALL TOPSOIL AND OTHER MATERIALS SUITABLE FOR
<br />/� ( l \ � � � COLORADO DIVER 3. PHASE lA MINING TO GENERATE INITIAL SCREENING AND PROVIDE LANDSCAPE /WATER FEATURE AS BUFFER RECLAMATION, REPLACING THE WORKING SURFACE WITH FIU. AS NEEDED.
<br />•�_
<br />�f / �' \ \ j \ � � � ���' � � = � TO EAST. PHASE IA MAY BE LIMITED IN DEPTH OR EXTENT TO SPECIFICALLY MEET THESE FUNCTIONAL 11. FLOODPUIN AND FLOODWAY INFORMATION TAKEN FEMA MAP NUMBER 08020510910, REVISED AUGUST
<br />"� � � � 3 NEEDS
<br />2,2006
<br />/ � w,\ � \ 3 ' • � \ I / � � � ( I � - - 4. RESERVE QUALITY THE PROPERTY CONTAINS REUTIVELY HOMOGENOUS SAND AND NATURAL GRAVEL 12. PRIOR TO ERECTION OF PROCESSING AND PLANT FACILITIES, THE OPERATOR WILh REMOVE TOP50A AND
<br />/ . _ . \� \ ' . V . ' Y �' � � 'Z� � �' � ��. I � -> DEPOSIT ABOVE 25 FEET BELOW GRADE, WITH INTERMINGLED LARGER ROCK. OVERBURDEN FROM THE PROCESSING AREA AND ENSURE (BY IMPORTING OR GENERATING ON -SITE) A SOLID
<br />`\ � � � ` \ " - �� � � � � GRAVEL BASE NO LESS THAN TWO FEET ABOVE GROUNDWATER. TOPSOIL SHALL BE RECOVERED, WHERE
<br />" � � ` '"< � � ` -' ( ` � - � 5. DEWATERIN6 AND RECHARGE. THE SITE WILL BE DRY -MINED OR OTHERWISE DEWATERED TO PROVIDE AVAIUBLE, TO A DEPTH OF AT LEAST SIX INCHES. SALVAGED MATERIALS SHALL BE STORED IN SCREENING
<br />� • • � � �� \ � . � � � � � � ` 3� MACHINE ACCESS TO THE AGGREGATE RESOURCE. PUMPED WATER WILL BE DIRECTED TO A SUMP AREA (AFTER AND BUFFERING BERMS (FOR LOCATION, SEE PUN) AND PHASE 10VERBURDEN STAGI
<br />/ r � \ 25' EMBANKMENT AT TOP � N6 (SEE PLAN AND NOTE
<br />°° ° � ^ . ' . ' . ' � \s �� ' . ' . ' - (3:1 MIN. SIDE SLOPES � / - I INITIAL RESOURCE RECOVERY IN SUMP FOOTPRINT AND CONSTRUCTION OF COFFERDAM) FOR CLARIFICATION BELOW).
<br />/ ,, (� " >•/ , � \ � _ � `' �. � ` � AND USE IN WETLAND RECHARGE OR DISCHARGE TO COLORADO RIVER IN ACCORDANCE WITH PERMITS FROM
<br />/ � \ `� . � .. � SPILLWAY \ / OTHER AGENCIES (E.G. ARMY CORPS OF ENGINEER'S, COLORADO DEPARTMENT OF PUBLIC HEALTH AND 13. PHASE I OVERBURDEN STAGING. NON- TOPSOIL OVERBURDEN, TO 71-IE EXTENT PRESENT IN PNASE 1
<br />` "� ' � � s \�; . \ (SEE NOTE 14) ' ' \ ENVIRONMENT).
<br />/ ` I . - + • _ �\\ � a \ + •,� - _ - -' �s \ PROCESSING AND MINING AREAS, WILL BE STORED IPl A TEMPORARY STOCKPILE, AS DEPICTED ON THIS PLAN.
<br />_ TNIS STOCKPILE IS TEMPORARY ONLY, WITH MATERIALS TO BE PLACED WITHIN CURIFICATION BASIN OR
<br />,. . a �1{ I_ _ _ _ _ _ _ _ _ � \ \\ `, \\ \ 6 AND HAUL OUTE�A APPROP IATE�LL COOPERATIVELY USE DEVELOPED 6A5 ROADS AS INTERNAL ACCESS MINING SIDE SLOPES FOR CONCURRENT RECLAMATION. THE STOCKPILE WILL BE REMOVED PRIOR TO PHASE 1
<br />� / � � � ` 1' � :. ` . = � : � I l � i 200' \ \ ° � � MINING IN THIS AREA.
<br />° / �) ', i i � � 7. TOTAL SURFACE AREA SUBJECT TO MINED LAND RECLAMATION PERMITTING, AS ILLUSTRATED, IS 163.31 14. SPILLWAYS. RIPRAP- ARMORED SPILLWAYS WILL BE INSTALLED TO ALLOW FOR FILLING OF PIT AREAS PRIOR
<br />`� , ' . ` _ " _ " _ .2 � i \ i � ` m, _ m, _ � ACRES. TO FLOOD CRESTING AND METERED OUTLETTIN6 OF FLOODWATERS FROM ACTIVE OR RECLAIMED PITS
<br />' a/ ' , : _ ' _ � � _ _ _ _ I PHASE 1 B FOLLOWING THE 100 -YEAR FLOOD. CULVERTS, SIPHONS, AND OTHER STRUCTURES MAY BE USED TO CROSS
<br />/ � `"" — me M � B. CONCURRENT RECLAMATION. BASED ON LIMITED OVERBURDEN COVERAGE ON DEPOSIT, THE OPERATOR MAY DITCH LITERALS.
<br />NYDROCARBON
<br />/ - - - - MINING AREA `, \ MINE TO FINAL RECUMATION SLOPES. GIVEN AVAILABLE OVERBURDEN FOR CONCURRENT RECUMATION, THE
<br />1 RECOVERY PAD (22.42 ACRES)
<br />�''' � / ` I . ' . ' . ' ' _ ' , I \ I � ,, OPERATOR MAY ALSO MINE TO NEARLY VERIICAL AND BACKFILL TO FINAL RECLAMATION SLOPE. NO MORE 15. GROUNDWATER MONITORING WELLS SHALL REMAIN INTACT FOR THE DURATION OF MINING.
<br />_ ' - ' _ ' I�` \ THAN 1,000 LINEAR FEET OF WORKING FACE WILL EXCEED A STABLE POST - MINING CONFIGURATION BEFORE
<br />^ � �, \ � DEWATERING TRENCH
<br />1�� c� �, ) _ ',1,, �- -� . � PHASE 3A ",. _ . . � .:. ���� �� � � � �� (SEE DETAIL)
<br />I / �' \ _ ,:� MINING AREA � `, . - . ' .:.: ` .:. ' _ . ' . �, �\ �'�
<br />� � . ,
<br />(38.19 ACRES) ` ` :'` (
<br />_ _ �
<br />a ��
<br />PHASE 1 / 2 PROCESSING AREA 1 .� _ . �- �`
<br />�� / � (SEE NOTE 12, APPROX. LIMIT) ' �, - ' . , . � �� `, ` -�. `>
<br />�g
<br />H o � . � ' . CONCRETE PLANT i . � �° -- _' � SPALWAY � �
<br />`� / "� E � - � , `' (TYP.) / -_ �� l i (SEE NOTE 14)
<br />/ y � � ��� PHASE l OVERBURDEN STAGING � �
<br />� � - � C:
<br />" / '^ / 1 � � ASPNALTPLANT I_ (SEE NOTE 13)
<br />PRODUCT SORTING \
<br />/ : °.. 25' FROM TOP OF BANK (TYP.) f-� � � - -- -' - - - -- - -- I MW I � / �
<br />0 � ;.
<br />C
<br />_ _ -- -- - -, PHASE 3 ASPHALT / C � \�/ � > PROCESS /WASH WATER POND .� � ��\ '�� �' _ _ _ - / ,'�� , �
<br />° -- - - -� � ,�I� � CONCRETE PLANT ANd i � - - - -- - -_ �- —_ — -� _ __ F
<br />III���TTT"`"'
<br />-- � `� � PROCESSING AREA � _"`"'� � s "' � —srs — �, ,�•- —� - �� ..�xs s�><\ � _ .. �
<br />��' �` '��, (SEE NOTE 12, - �._. � fT- - - - -- - - -����: -�.d, i_. +;,
<br />f ! `" .:. APPROX. LIMIT) 25' FROM TOP OF BANK � — � � � � � C� i / � / � � 25 °^ `
<br />(� \�
<br />1 � I y Y - / \ / � � � - - _ _ _ _ _ _ _ / ACCESS ROAD AND PROPOSED PIPE OR REALIGN LAST CHANCE
<br />� ` ] � y � -' � � .. � I i I / PIPELINE EASEMENT DITCH NORTHERN LATERAL
<br />II I•� i'.E '- - � / \ �/ +°�� / FROM POINT OF DIVERSION
<br />F � /� i i I
<br />-). - g - - . ' . i EXI�N6 DRIVE AY TO BE ' ,� � � � � / HYDROCARBON � �
<br />i r . . . , . ,,� MAINTAINED TE�RARILY, / ' : "" �\ `' � � � E�OVERY PAD � � _
<br />',III ' i r - .le - `Y ` .�, . ;^ � r . � . NO TRUCK HAUL /USE �(ffOR MINING � " � _ _ � / ^� � i '/
<br />_ _ �/ /1
<br />VIII �- �� -�' k� .. -' � �, - \ � � � � � / /
<br />� - r}- � � -� � � � � � �''25' FROM TOP OF BANK
<br />�� .k!?, 1 ,, " '� �, � - PHASE 36 �.� /
<br />f /'
<br />' _ I ; ''. 'yi b � � HYDROCARBON �, MINING ARE71`. ;° ; I / � ,
<br />RELOCATED UTAITY I I iK ��� � ( ''i RECOVERY PAD � (24:34ACRE5) I I /
<br />,�� ,l'� �� ,� � � , � �/- � � � PHASE lA
<br />I� : � .� � � '� ';� � i i�' � • � ' � i / � MINING AREA
<br />g � PHASE 2 f ,. / , (i.72 ACRES). - "
<br />✓ ✓� t \ �� - � PHASE 3 PROCESSING AREA I � "� MINING AREA � � (SEE NOTC'3) ,�
<br />,_
<br />Ii
<br />(APPROX. LIMIT) ' J
<br />��� I� � � � � i i � � (16.86 ACRES) � � / � . � .,
<br />I TEMP6RARY'SCREENING BE,RMb
<br />I i a `r .�. � - _ ,
<br />I � 1 �� _f-�� � 25' FROM TOP OF BANK i 50' STOCKPILE OFFSET (TYP.) — / / ) PHASE 1 D 2 SITE ENTRANCE
<br />+� � � � I I i (UNLESS MINED TO STABLE _ � � � � -' ^1`1
<br />PHASE 3 SITE ENTRANCE III I� � "f ,,.+ ' SUPPORTING SLOE PER DMG) � �� -- j / - / � /
<br />' I,� -; � / SCREENINBd BUFFERING BERMS ( i � _ -. / l^ � ; � - � " 'I / /
<br />F� - i �� -_- (5E €pETAA) _i a-_ _ % ,� - . -��4Y / r - -� - \ /
<br />F ___ �_ /1 � -- �_ - -
<br />�� , I .
<br />_ ONU OHV OMU ONJ OHU OHU OHU I �_ OHU— ONU —� O}JU �1$j� / Hu�� I ~I � �' � � �� �. i �- /
<br />�_` � —�
<br />* I /�..D_ rry 1 \YTC� AA•A �JL - �� nW �— OHU �� - � —'OMV— OH}l��
<br />��
<br />t3'
<br />��
<br />��� .
<br />�( -
<br />1
<br />1=
<br />��
<br />1
<br />OHU� OHU -- OHU- OHV-
<br />ONU— OHU— ONU— OVW ONUj— ONU— ONV-
<br />L _I
<br />rm
<br />/ �
<br />® OHU— oHU-
<br />OHV- ONV- pNV- OHU- OHV- pµ /-
<br />U O - O - ONU- O LL OHU- OHU- pHJ-
<br />REMOTE SCALE I i UV41— OHO -- OHO— OHU_
<br />I
<br />CONVERTED OFFICE �
<br />(FORMER HOUSE) i >.
<br />PARKING iii -
<br />I�i
<br />Iii
<br />Ioi -.
<br />i '
<br />i '
<br />�'
<br />I '
<br />I '
<br />li
<br />I,
<br />i'
<br />I'
<br />r'
<br />I '
<br />I '
<br />,'
<br />l
<br />SEE PLANTING DETAA
<br />(ON RECLAMATION PLAN)
<br />a B
<br />BERM NOTE: POSITION OF BERMS MAY BE
<br />TEMPORARAY ADJUSTED TO ALLOW FOR
<br />b C7 INSTALLATION OFNATURALGASINFRASTRUCTURE.
<br />GRAbb -� � 1 �� r- GRASS
<br />PUBLIC R.O.W./ � `'f
<br />EXISTING 10' TYP.
<br />RESIDENCE MINING
<br />I ACTIVITIES
<br />d
<br />TYPICAL CROSS- SECTION OF SCREENING BERMS
<br />NTS
<br />TO BE REMOVED
<br />FOR FINAL GRADE
<br />THE OPERATOR MAY MINE TO \
<br />LIMIT OF EXCAVATION AT OR
<br />NEAR VERTICAL SLOPES
<br />(SEE NOTE 8)
<br />ANTICIPATED GROUNDWATER LEVEL
<br />MINED SLOPE
<br />(2.5H:1V)
<br />FINAL SLOPE
<br />(3H:1V FOR 15' THEN 2H:IV)
<br />(SEE EXHIBIT F DETAA)
<br />- -�1 _
<br />Permit #: !>7- ,� [ F�
<br />Doc. Name: � I(1 i a
<br />TOP OF Doc. Date (if no date
<br />TOP OF MINING RECLAMATION Inspection Date_
<br />CUT n Ir
<br />PERMIT
<br />I
<br />� 25' MIN.
<br />NATURAL
<br />i
<br />GROUND
<br />_ SHALE / BEDRaLK --
<br />TYPICAL EXCAVATION SLOPE DETAIL
<br />NTS
<br />1:15LOPE5, EXCAVATE
<br />IN PLACE (TYP.)
<br />TRENCH NOTE: DEWATERING
<br />TRENCHES ARE TEMPORARY
<br />FEATURES, TO BE REMOVED PRIOR
<br />TO FINAL RECLAMATION.
<br />�� LINE WITH PLASTICSHEETTN6
<br />AS NEEDED TO STABILIZE SOIL
<br />DEWATERIN6 TRENCH DETAIL
<br />NTS
<br />a
<br />Confidental?:
<br />_7-Gf Section /Exh.
<br />��C�'r�iF:n
<br />sFp � � Zoos
<br />�1vi Uri Of ii �rl�R!
<br />�'�9 ;i,,�:r q_ X0,1,
<br />PREPARED UNDER THE SUPERVISION OF:
<br />DATE
<br />i
<br />REVISED
<br />EXHIBIT C -2: MINING PLAN MAP
<br />i
<br />::BANKS AND GESSO, LLC
<br />SILT SAND &GRAVEL L.L.C.
<br />GRAND RIVER PARK PROJECT
<br />720 KIPLIN6 ST., SUITE 117
<br />DM6 112 PERMIT APPLICATION
<br />UKEWOOD, COLORADO 80215
<br />(303)274 -4277
<br />0304 HIGHWAY 133
<br />CARBONDAlE,CO 81623
<br />/
<br />(970)963 -2296
<br />JOB NO DATE
<br />05021 9/5/06
<br />SCALE
<br />1" =200'
<br />/
<br />DESIGNED BY
<br />APPROVAL
<br />REV
<br />SHEE
<br />/
<br />I
<br />,-
<br />/'
<br />,,
<br />s��a
<br />'L�G
<br />/ii;
<br />QSy
<br />�/
<br />/ ' '�
<br />,-
<br />_...
<br />, ,.
<br />.,
<br />�,,
<br />"�-
<br />� --
<br />rm
<br />/ �
<br />® OHU— oHU-
<br />OHV- ONV- pNV- OHU- OHV- pµ /-
<br />U O - O - ONU- O LL OHU- OHU- pHJ-
<br />REMOTE SCALE I i UV41— OHO -- OHO— OHU_
<br />I
<br />CONVERTED OFFICE �
<br />(FORMER HOUSE) i >.
<br />PARKING iii -
<br />I�i
<br />Iii
<br />Ioi -.
<br />i '
<br />i '
<br />�'
<br />I '
<br />I '
<br />li
<br />I,
<br />i'
<br />I'
<br />r'
<br />I '
<br />I '
<br />,'
<br />l
<br />SEE PLANTING DETAA
<br />(ON RECLAMATION PLAN)
<br />a B
<br />BERM NOTE: POSITION OF BERMS MAY BE
<br />TEMPORARAY ADJUSTED TO ALLOW FOR
<br />b C7 INSTALLATION OFNATURALGASINFRASTRUCTURE.
<br />GRAbb -� � 1 �� r- GRASS
<br />PUBLIC R.O.W./ � `'f
<br />EXISTING 10' TYP.
<br />RESIDENCE MINING
<br />I ACTIVITIES
<br />d
<br />TYPICAL CROSS- SECTION OF SCREENING BERMS
<br />NTS
<br />TO BE REMOVED
<br />FOR FINAL GRADE
<br />THE OPERATOR MAY MINE TO \
<br />LIMIT OF EXCAVATION AT OR
<br />NEAR VERTICAL SLOPES
<br />(SEE NOTE 8)
<br />ANTICIPATED GROUNDWATER LEVEL
<br />MINED SLOPE
<br />(2.5H:1V)
<br />FINAL SLOPE
<br />(3H:1V FOR 15' THEN 2H:IV)
<br />(SEE EXHIBIT F DETAA)
<br />- -�1 _
<br />Permit #: !>7- ,� [ F�
<br />Doc. Name: � I(1 i a
<br />TOP OF Doc. Date (if no date
<br />TOP OF MINING RECLAMATION Inspection Date_
<br />CUT n Ir
<br />PERMIT
<br />I
<br />� 25' MIN.
<br />NATURAL
<br />i
<br />GROUND
<br />_ SHALE / BEDRaLK --
<br />TYPICAL EXCAVATION SLOPE DETAIL
<br />NTS
<br />1:15LOPE5, EXCAVATE
<br />IN PLACE (TYP.)
<br />TRENCH NOTE: DEWATERING
<br />TRENCHES ARE TEMPORARY
<br />FEATURES, TO BE REMOVED PRIOR
<br />TO FINAL RECLAMATION.
<br />�� LINE WITH PLASTICSHEETTN6
<br />AS NEEDED TO STABILIZE SOIL
<br />DEWATERIN6 TRENCH DETAIL
<br />NTS
<br />a
<br />Confidental?:
<br />_7-Gf Section /Exh.
<br />��C�'r�iF:n
<br />sFp � � Zoos
<br />�1vi Uri Of ii �rl�R!
<br />�'�9 ;i,,�:r q_ X0,1,
<br />PREPARED UNDER THE SUPERVISION OF:
<br />DATE
<br />i
<br />REVISED
<br />EXHIBIT C -2: MINING PLAN MAP
<br />MAXIMUM RECOVERY SCENARIO
<br />::BANKS AND GESSO, LLC
<br />SILT SAND &GRAVEL L.L.C.
<br />GRAND RIVER PARK PROJECT
<br />720 KIPLIN6 ST., SUITE 117
<br />DM6 112 PERMIT APPLICATION
<br />UKEWOOD, COLORADO 80215
<br />(303)274 -4277
<br />0304 HIGHWAY 133
<br />CARBONDAlE,CO 81623
<br />GARFIELD COUNTY
<br />COLORADO
<br />(970)963 -2296
<br />JOB NO DATE
<br />05021 9/5/06
<br />SCALE
<br />1" =200'
<br />DRAWN BY
<br />DRF
<br />DESIGNED BY
<br />APPROVAL
<br />REV
<br />SHEE
<br />I
<br />
|