Laserfiche WebLink
LEGEND <br />GRAPHIC SCALE <br />( IN FEET ) <br />1 inch = 200 ft. <br />CONTROURINTERVAL =5' <br />�� <br />< <br />�A <br />INITIAL RECOVERY TO CONSTRUCT <br />CLARIFICATION BASIN <br />SUMP /CLARIFICATION BASIN <br />� (SEE NOTE 5) <br />� COFFERDAM OR OTHER TEMPORARY <br />IMPERMEABLEBARRIER <br />MINING SCHEDULE <br />SECTION LINE <br />ACREAGE <br />PROPERTY LINE <br />�- - . ___ - <br />EASEMENT /ROW <br />C � <br />PROPOSED EASEMENT <br />0.10 <br />PAVED ROAD <br />22,42 <br />1,300,300 <br />----- - - - - ------------------ <br />------------------------------ <br />UNPAVED ROAD <br />- - - _ - . - - . - .. - .. - <br />DITCH /WATERWAY <br />`° " °° ^ °° ^ <br />FLOODPUIN ZONE A <br />` °' `° " °° c <br />FLOODPUIN ZONE X <br />- °w— °w— ' "wFw —� —Fw- <br />FLOODWAY <br />'� �' � �� <br />MINING LIMIT /POND BOUNDARY <br />'� � � � <br />PERMIT BOUNDARY <br />REV <br />EXISTIN6INDEX CONTOUR <br />EXISTIN6INTERMEDIATECONTOUR <br />— ws— sns— ws— 6"s— s•s— <br />EXISTING6A5 LINE <br />PROPOSED 6A5 LINE <br />— orn,— oHU— oHU— oNV— oNU— <br />EXISTING OVERHEAD UTILITY <br />- — � <br />RELOCATED OVERHEAp UTILITY <br />EXISTING PHONE CABLE <br />EXISTING STRUCTURE <br />' v - - =BMW <br />7URISDICTIONAL WETUNDS <br />O <br />MONITORING WEU, <br />1 <br />DIRECTION OF MINING <br />GRAPHIC SCALE <br />( IN FEET ) <br />1 inch = 200 ft. <br />CONTROURINTERVAL =5' <br />�� <br />< <br />�A <br />INITIAL RECOVERY TO CONSTRUCT <br />CLARIFICATION BASIN <br />SUMP /CLARIFICATION BASIN <br />� (SEE NOTE 5) <br />� COFFERDAM OR OTHER TEMPORARY <br />IMPERMEABLEBARRIER <br />MINING SCHEDULE <br />PHASE <br />ACREAGE <br />RESERVE (TONS) <br />YEARS TO MINE* <br />lA <br />1.72 <br />76,500 <br />0.10 <br />1B <br />22,42 <br />1,300,300 <br />2.50 <br />2 <br />16.86 <br />829,200 <br />1.75 <br />3A <br />38.19 <br />1,959,600 <br />4.00 <br />36 <br />24,34 <br />1,262,000 <br />2.75 <br />"bttNUlty <br />�F"°� w NOTES: <br />� � <br />"° � 1. TOPOGRAPHICAL CONTOURS TAKEN FROM U565 SAT COLORADO QUADRANGLE AT 20' CONTOUR INTERVALS IMPLEMENTATION OF CONCURRENT RECUMATION IS REQUIRED TO LIMITNEAR - VERTICAL SLOPES. <br />AND INTERPOLATED AT 5' CONTOUR INTERVALS. <br />3 <br />vv ^i ^sue <br />2. APPROXIMATE DEPTH OF MINED AREA I5 25 FEET WITH 2.5H:IV SIDE SLOPES. THE OPERATOR WILL MINE TO 9 ACTUTALMARKET ONDITIONS AND MINING �LHEOULE MAO VARYND 500,000 TONS l YEAR MARKET DEMAND. <br />�� � � \ � � _ .. _ � I 2.5:1 SLOPES, OR RECOVERY TO NEAR - VERTICAL SLOPES, WHERE PRACTICAL, GIVEN LIMITED OVERBURDEN ND <br />\ , / �/ � � . � , � � - � ... _ _ - _ .. _ ... _ ... — LIMITED STOCKPILING FOOTPRINT. OVERBURDEN AND TOPSOA MATERIAL USED FOR SCREENING BERMS 10. ASPHALT AND / OR CONCRETE PUNT FACILITIES MAY BE LOCATED IN THE PHASE 1 / 3 PROCESSING AREAS. <br />/ �/ � \� ` 1 - I - DURING MINING WILL BE BACKFILL PLACED ALON6SHORELINE CRO55- SLOPES DURING FINAL RECLAMATION THE PROCESSING AREA MAY ALSO CONTAIN TRUCK PARKING, EQUIPMENT STORAGE, AND OTHER ACCESSORY <br />/' / �� � � �'R., � _ TO ACHIEVE FINAL SLOPES OF 3:1 AND 2:1, AS IDENTIFIED IN THE RECLAMATION PLAN. USES. THIS AREA WILL BE PREPARED BY REMOVING ALL TOPSOIL AND OTHER MATERIALS SUITABLE FOR <br />/� ( l \ � � � COLORADO DIVER 3. PHASE lA MINING TO GENERATE INITIAL SCREENING AND PROVIDE LANDSCAPE /WATER FEATURE AS BUFFER RECLAMATION, REPLACING THE WORKING SURFACE WITH FIU. AS NEEDED. <br />•�_ <br />�f / �' \ \ j \ � � � ���' � � = � TO EAST. PHASE IA MAY BE LIMITED IN DEPTH OR EXTENT TO SPECIFICALLY MEET THESE FUNCTIONAL 11. FLOODPUIN AND FLOODWAY INFORMATION TAKEN FEMA MAP NUMBER 08020510910, REVISED AUGUST <br />"� � � � 3 NEEDS <br />2,2006 <br />/ � w,\ � \ 3 ' • � \ I / � � � ( I � - - 4. RESERVE QUALITY THE PROPERTY CONTAINS REUTIVELY HOMOGENOUS SAND AND NATURAL GRAVEL 12. PRIOR TO ERECTION OF PROCESSING AND PLANT FACILITIES, THE OPERATOR WILh REMOVE TOP50A AND <br />/ . _ . \� \ ' . V . ' Y �' � � 'Z� � �' � ��. I � -> DEPOSIT ABOVE 25 FEET BELOW GRADE, WITH INTERMINGLED LARGER ROCK. OVERBURDEN FROM THE PROCESSING AREA AND ENSURE (BY IMPORTING OR GENERATING ON -SITE) A SOLID <br />`\ � � � ` \ " - �� � � � � GRAVEL BASE NO LESS THAN TWO FEET ABOVE GROUNDWATER. TOPSOIL SHALL BE RECOVERED, WHERE <br />" � � ` '"< � � ` -' ( ` � - � 5. DEWATERIN6 AND RECHARGE. THE SITE WILL BE DRY -MINED OR OTHERWISE DEWATERED TO PROVIDE AVAIUBLE, TO A DEPTH OF AT LEAST SIX INCHES. SALVAGED MATERIALS SHALL BE STORED IN SCREENING <br />� • • � � �� \ � . � � � � � � ` 3� MACHINE ACCESS TO THE AGGREGATE RESOURCE. PUMPED WATER WILL BE DIRECTED TO A SUMP AREA (AFTER AND BUFFERING BERMS (FOR LOCATION, SEE PUN) AND PHASE 10VERBURDEN STAGI <br />/ r � \ 25' EMBANKMENT AT TOP � N6 (SEE PLAN AND NOTE <br />°° ° � ^ . ' . ' . ' � \s �� ' . ' . ' - (3:1 MIN. SIDE SLOPES � / - I INITIAL RESOURCE RECOVERY IN SUMP FOOTPRINT AND CONSTRUCTION OF COFFERDAM) FOR CLARIFICATION BELOW). <br />/ ,, (� " >•/ , � \ � _ � `' �. � ` � AND USE IN WETLAND RECHARGE OR DISCHARGE TO COLORADO RIVER IN ACCORDANCE WITH PERMITS FROM <br />/ � \ `� . � .. � SPILLWAY \ / OTHER AGENCIES (E.G. ARMY CORPS OF ENGINEER'S, COLORADO DEPARTMENT OF PUBLIC HEALTH AND 13. PHASE I OVERBURDEN STAGING. NON- TOPSOIL OVERBURDEN, TO 71-IE EXTENT PRESENT IN PNASE 1 <br />` "� ' � � s \�; . \ (SEE NOTE 14) ' ' \ ENVIRONMENT). <br />/ ` I . - + • _ �\\ � a \ + •,� - _ - -' �s \ PROCESSING AND MINING AREAS, WILL BE STORED IPl A TEMPORARY STOCKPILE, AS DEPICTED ON THIS PLAN. <br />_ TNIS STOCKPILE IS TEMPORARY ONLY, WITH MATERIALS TO BE PLACED WITHIN CURIFICATION BASIN OR <br />,. . a �1{ I_ _ _ _ _ _ _ _ _ � \ \\ `, \\ \ 6 AND HAUL OUTE�A APPROP IATE�LL COOPERATIVELY USE DEVELOPED 6A5 ROADS AS INTERNAL ACCESS MINING SIDE SLOPES FOR CONCURRENT RECLAMATION. THE STOCKPILE WILL BE REMOVED PRIOR TO PHASE 1 <br />� / � � � ` 1' � :. ` . = � : � I l � i 200' \ \ ° � � MINING IN THIS AREA. <br />° / �) ', i i � � 7. TOTAL SURFACE AREA SUBJECT TO MINED LAND RECLAMATION PERMITTING, AS ILLUSTRATED, IS 163.31 14. SPILLWAYS. RIPRAP- ARMORED SPILLWAYS WILL BE INSTALLED TO ALLOW FOR FILLING OF PIT AREAS PRIOR <br />`� , ' . ` _ " _ " _ .2 � i \ i � ` m, _ m, _ � ACRES. TO FLOOD CRESTING AND METERED OUTLETTIN6 OF FLOODWATERS FROM ACTIVE OR RECLAIMED PITS <br />' a/ ' , : _ ' _ � � _ _ _ _ I PHASE 1 B FOLLOWING THE 100 -YEAR FLOOD. CULVERTS, SIPHONS, AND OTHER STRUCTURES MAY BE USED TO CROSS <br />/ � `"" — me M � B. CONCURRENT RECLAMATION. BASED ON LIMITED OVERBURDEN COVERAGE ON DEPOSIT, THE OPERATOR MAY DITCH LITERALS. <br />NYDROCARBON <br />/ - - - - MINING AREA `, \ MINE TO FINAL RECUMATION SLOPES. GIVEN AVAILABLE OVERBURDEN FOR CONCURRENT RECUMATION, THE <br />1 RECOVERY PAD (22.42 ACRES) <br />�''' � / ` I . ' . ' . ' ' _ ' , I \ I � ,, OPERATOR MAY ALSO MINE TO NEARLY VERIICAL AND BACKFILL TO FINAL RECLAMATION SLOPE. NO MORE 15. GROUNDWATER MONITORING WELLS SHALL REMAIN INTACT FOR THE DURATION OF MINING. <br />_ ' - ' _ ' I�` \ THAN 1,000 LINEAR FEET OF WORKING FACE WILL EXCEED A STABLE POST - MINING CONFIGURATION BEFORE <br />^ � �, \ � DEWATERING TRENCH <br />1�� c� �, ) _ ',1,, �- -� . � PHASE 3A ",. _ . . � .:. ���� �� � � � �� (SEE DETAIL) <br />I / �' \ _ ,:� MINING AREA � `, . - . ' .:.: ` .:. ' _ . ' . �, �\ �'� <br />� � . , <br />(38.19 ACRES) ` ` :'` ( <br />_ _ � <br />a �� <br />PHASE 1 / 2 PROCESSING AREA 1 .� _ . �- �` <br />�� / � (SEE NOTE 12, APPROX. LIMIT) ' �, - ' . , . � �� `, ` -�. `> <br />�g <br />H o � . � ' . CONCRETE PLANT i . � �° -- _' � SPALWAY � � <br />`� / "� E � - � , `' (TYP.) / -_ �� l i (SEE NOTE 14) <br />/ y � � ��� PHASE l OVERBURDEN STAGING � � <br />� � - � C: <br />" / '^ / 1 � � ASPNALTPLANT I_ (SEE NOTE 13) <br />PRODUCT SORTING \ <br />/ : °.. 25' FROM TOP OF BANK (TYP.) f-� � � - -- -' - - - -- - -- I MW I � / � <br />0 � ;. <br />C <br />_ _ -- -- - -, PHASE 3 ASPHALT / C � \�/ � > PROCESS /WASH WATER POND .� � ��\ '�� �' _ _ _ - / ,'�� , � <br />° -- - - -� � ,�I� � CONCRETE PLANT ANd i � - - - -- - -_ �- —_ — -� _ __ F <br />III���TTT"`"' <br />-- � `� � PROCESSING AREA � _"`"'� � s "' � —srs — �, ,�•- —� - �� ..�xs s�><\ � _ .. � <br />��' �` '��, (SEE NOTE 12, - �._. � fT- - - - -- - - -����: -�.d, i_. +;, <br />f ! `" .:. APPROX. LIMIT) 25' FROM TOP OF BANK � — � � � � � C� i / � / � � 25 °^ ` <br />(� \� <br />1 � I y Y - / \ / � � � - - _ _ _ _ _ _ _ / ACCESS ROAD AND PROPOSED PIPE OR REALIGN LAST CHANCE <br />� ` ] � y � -' � � .. � I i I / PIPELINE EASEMENT DITCH NORTHERN LATERAL <br />II I•� i'.E '- - � / \ �/ +°�� / FROM POINT OF DIVERSION <br />F � /� i i I <br />-). - g - - . ' . i EXI�N6 DRIVE AY TO BE ' ,� � � � � / HYDROCARBON � � <br />i r . . . , . ,,� MAINTAINED TE�RARILY, / ' : "" �\ `' � � � E�OVERY PAD � � _ <br />',III ' i r - .le - `Y ` .�, . ;^ � r . � . NO TRUCK HAUL /USE �(ffOR MINING � " � _ _ � / ^� � i '/ <br />_ _ �/ /1 <br />VIII �- �� -�' k� .. -' � �, - \ � � � � � / / <br />� - r}- � � -� � � � � � �''25' FROM TOP OF BANK <br />�� .k!?, 1 ,, " '� �, � - PHASE 36 �.� / <br />f /' <br />' _ I ; ''. 'yi b � � HYDROCARBON �, MINING ARE71`. ;° ; I / � , <br />RELOCATED UTAITY I I iK ��� � ( ''i RECOVERY PAD � (24:34ACRE5) I I / <br />,�� ,l'� �� ,� � � , � �/- � � � PHASE lA <br />I� : � .� � � '� ';� � i i�' � • � ' � i / � MINING AREA <br />g � PHASE 2 f ,. / , (i.72 ACRES). - " <br />✓ ✓� t \ �� - � PHASE 3 PROCESSING AREA I � "� MINING AREA � � (SEE NOTC'3) ,� <br />,_ <br />Ii <br />(APPROX. LIMIT) ' J <br />��� I� � � � � i i � � (16.86 ACRES) � � / � . � ., <br />I TEMP6RARY'SCREENING BE,RMb <br />I i a `r .�. � - _ , <br />I � 1 �� _f-�� � 25' FROM TOP OF BANK i 50' STOCKPILE OFFSET (TYP.) — / / ) PHASE 1 D 2 SITE ENTRANCE <br />+� � � � I I i (UNLESS MINED TO STABLE _ � � � � -' ^1`1 <br />PHASE 3 SITE ENTRANCE III I� � "f ,,.+ ' SUPPORTING SLOE PER DMG) � �� -- j / - / � / <br />' I,� -; � / SCREENINBd BUFFERING BERMS ( i � _ -. / l^ � ; � - � " 'I / / <br />F� - i �� -_- (5E €pETAA) _i a-_ _ % ,� - . -��4Y / r - -� - \ / <br />F ___ �_ /1 � -- �_ - - <br />�� , I . <br />_ ONU OHV OMU ONJ OHU OHU OHU I �_ OHU— ONU —� O}JU �1$j� / Hu�� I ~I � �' � � �� �. i �- / <br />�_` � —� <br />* I /�..D_ rry 1 \YTC� AA•A �JL - �� nW �— OHU �� - � —'OMV— OH}l�� <br />�� <br />t3' <br />�� <br />��� . <br />�( - <br />1 <br />1= <br />�� <br />1 <br />OHU� OHU -- OHU- OHV- <br />ONU— OHU— ONU— OVW ONUj— ONU— ONV- <br />L _I <br />rm <br />/ � <br />® OHU— oHU- <br />OHV- ONV- pNV- OHU- OHV- pµ /- <br />U O - O - ONU- O LL OHU- OHU- pHJ- <br />REMOTE SCALE I i UV41— OHO -- OHO— OHU_ <br />I <br />CONVERTED OFFICE � <br />(FORMER HOUSE) i >. <br />PARKING iii - <br />I�i <br />Iii <br />Ioi -. <br />i ' <br />i ' <br />�' <br />I ' <br />I ' <br />li <br />I, <br />i' <br />I' <br />r' <br />I ' <br />I ' <br />,' <br />l <br />SEE PLANTING DETAA <br />(ON RECLAMATION PLAN) <br />a B <br />BERM NOTE: POSITION OF BERMS MAY BE <br />TEMPORARAY ADJUSTED TO ALLOW FOR <br />b C7 INSTALLATION OFNATURALGASINFRASTRUCTURE. <br />GRAbb -� � 1 �� r- GRASS <br />PUBLIC R.O.W./ � `'f <br />EXISTING 10' TYP. <br />RESIDENCE MINING <br />I ACTIVITIES <br />d <br />TYPICAL CROSS- SECTION OF SCREENING BERMS <br />NTS <br />TO BE REMOVED <br />FOR FINAL GRADE <br />THE OPERATOR MAY MINE TO \ <br />LIMIT OF EXCAVATION AT OR <br />NEAR VERTICAL SLOPES <br />(SEE NOTE 8) <br />ANTICIPATED GROUNDWATER LEVEL <br />MINED SLOPE <br />(2.5H:1V) <br />FINAL SLOPE <br />(3H:1V FOR 15' THEN 2H:IV) <br />(SEE EXHIBIT F DETAA) <br />- -�1 _ <br />Permit #: !>7- ,� [ F� <br />Doc. Name: � I(1 i a <br />TOP OF Doc. Date (if no date <br />TOP OF MINING RECLAMATION Inspection Date_ <br />CUT n Ir <br />PERMIT <br />I <br />� 25' MIN. <br />NATURAL <br />i <br />GROUND <br />_ SHALE / BEDRaLK -- <br />TYPICAL EXCAVATION SLOPE DETAIL <br />NTS <br />1:15LOPE5, EXCAVATE <br />IN PLACE (TYP.) <br />TRENCH NOTE: DEWATERING <br />TRENCHES ARE TEMPORARY <br />FEATURES, TO BE REMOVED PRIOR <br />TO FINAL RECLAMATION. <br />�� LINE WITH PLASTICSHEETTN6 <br />AS NEEDED TO STABILIZE SOIL <br />DEWATERIN6 TRENCH DETAIL <br />NTS <br />a <br />Confidental?: <br />_7-Gf Section /Exh. <br />��C�'r�iF:n <br />sFp � � Zoos <br />�1vi Uri Of ii �rl�R! <br />�'�9 ;i,,�:r q_ X0,1, <br />PREPARED UNDER THE SUPERVISION OF: <br />DATE <br />i <br />REVISED <br />EXHIBIT C -2: MINING PLAN MAP <br />i <br />::BANKS AND GESSO, LLC <br />SILT SAND &GRAVEL L.L.C. <br />GRAND RIVER PARK PROJECT <br />720 KIPLIN6 ST., SUITE 117 <br />DM6 112 PERMIT APPLICATION <br />UKEWOOD, COLORADO 80215 <br />(303)274 -4277 <br />0304 HIGHWAY 133 <br />CARBONDAlE,CO 81623 <br />/ <br />(970)963 -2296 <br />JOB NO DATE <br />05021 9/5/06 <br />SCALE <br />1" =200' <br />/ <br />DESIGNED BY <br />APPROVAL <br />REV <br />SHEE <br />/ <br />I <br />,- <br />/' <br />,, <br />s��a <br />'L�G <br />/ii; <br />QSy <br />�/ <br />/ ' '� <br />,- <br />_... <br />, ,. <br />., <br />�,, <br />"�- <br />� -- <br />rm <br />/ � <br />® OHU— oHU- <br />OHV- ONV- pNV- OHU- OHV- pµ /- <br />U O - O - ONU- O LL OHU- OHU- pHJ- <br />REMOTE SCALE I i UV41— OHO -- OHO— OHU_ <br />I <br />CONVERTED OFFICE � <br />(FORMER HOUSE) i >. <br />PARKING iii - <br />I�i <br />Iii <br />Ioi -. <br />i ' <br />i ' <br />�' <br />I ' <br />I ' <br />li <br />I, <br />i' <br />I' <br />r' <br />I ' <br />I ' <br />,' <br />l <br />SEE PLANTING DETAA <br />(ON RECLAMATION PLAN) <br />a B <br />BERM NOTE: POSITION OF BERMS MAY BE <br />TEMPORARAY ADJUSTED TO ALLOW FOR <br />b C7 INSTALLATION OFNATURALGASINFRASTRUCTURE. <br />GRAbb -� � 1 �� r- GRASS <br />PUBLIC R.O.W./ � `'f <br />EXISTING 10' TYP. <br />RESIDENCE MINING <br />I ACTIVITIES <br />d <br />TYPICAL CROSS- SECTION OF SCREENING BERMS <br />NTS <br />TO BE REMOVED <br />FOR FINAL GRADE <br />THE OPERATOR MAY MINE TO \ <br />LIMIT OF EXCAVATION AT OR <br />NEAR VERTICAL SLOPES <br />(SEE NOTE 8) <br />ANTICIPATED GROUNDWATER LEVEL <br />MINED SLOPE <br />(2.5H:1V) <br />FINAL SLOPE <br />(3H:1V FOR 15' THEN 2H:IV) <br />(SEE EXHIBIT F DETAA) <br />- -�1 _ <br />Permit #: !>7- ,� [ F� <br />Doc. Name: � I(1 i a <br />TOP OF Doc. Date (if no date <br />TOP OF MINING RECLAMATION Inspection Date_ <br />CUT n Ir <br />PERMIT <br />I <br />� 25' MIN. <br />NATURAL <br />i <br />GROUND <br />_ SHALE / BEDRaLK -- <br />TYPICAL EXCAVATION SLOPE DETAIL <br />NTS <br />1:15LOPE5, EXCAVATE <br />IN PLACE (TYP.) <br />TRENCH NOTE: DEWATERING <br />TRENCHES ARE TEMPORARY <br />FEATURES, TO BE REMOVED PRIOR <br />TO FINAL RECLAMATION. <br />�� LINE WITH PLASTICSHEETTN6 <br />AS NEEDED TO STABILIZE SOIL <br />DEWATERIN6 TRENCH DETAIL <br />NTS <br />a <br />Confidental?: <br />_7-Gf Section /Exh. <br />��C�'r�iF:n <br />sFp � � Zoos <br />�1vi Uri Of ii �rl�R! <br />�'�9 ;i,,�:r q_ X0,1, <br />PREPARED UNDER THE SUPERVISION OF: <br />DATE <br />i <br />REVISED <br />EXHIBIT C -2: MINING PLAN MAP <br />MAXIMUM RECOVERY SCENARIO <br />::BANKS AND GESSO, LLC <br />SILT SAND &GRAVEL L.L.C. <br />GRAND RIVER PARK PROJECT <br />720 KIPLIN6 ST., SUITE 117 <br />DM6 112 PERMIT APPLICATION <br />UKEWOOD, COLORADO 80215 <br />(303)274 -4277 <br />0304 HIGHWAY 133 <br />CARBONDAlE,CO 81623 <br />GARFIELD COUNTY <br />COLORADO <br />(970)963 -2296 <br />JOB NO DATE <br />05021 9/5/06 <br />SCALE <br />1" =200' <br />DRAWN BY <br />DRF <br />DESIGNED BY <br />APPROVAL <br />REV <br />SHEE <br />I <br />