Laserfiche WebLink
f <br />III IIIIIIIIIIIIIIII <br />E~~A <br />S Coa/Company Seneca Coal Company <br />January 11, 1999 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond inspections <br />Dear Mr. Boulay: <br />Enclosed are copies of the fourth quarter stockpond inspections <br />for those structures at Seneca II-W which have been constructed <br />to date. Inspections for Stockponds T-1, T-2, T-3, T-22 and T-24 <br />are included. Most of the stockponds have been cleaned out and <br />the sediment removed from them. <br />Should you have any questions, please do not hesitate to call. <br />Si <br /> <br />Mi <br />En <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />,~~,~; x.1999 <br />