Laserfiche WebLink
iii ~ininurr~~i iii <br />999 <br />E~~A <br />S Coal Company Seneca Coal Company <br />April 20, 1998 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Seneca II-W Mine <br />Dear Ms. Crosby: <br />Enclosed is the first quarter inspection reports for Ponds 005, <br />006, and 009 at the Seneca II-W Mine. Conditions appeared stable <br />and acceptable at ponds 005 and 009. Repairs were initiated but <br />will need to be completed at the far west end of the slump area <br />in the NE corner of pond 006. Work has been initiated on the 006 <br />Pre-Settling Basin and the related inlet and outlet channels. <br />The pond 006 spillways will be revised once ground and weather <br />conditions allow. <br />If you have any questions, please call me. <br />~G <br />Altaic `~~a, P.E. <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />APR 2 0 1998 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 2763014 <br />