My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66665
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:27 PM
Creation date
11/20/2007 9:30:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
10/23/2007
Doc Name
Plan of operations
From
BLM
To
Energy Fuels Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior <br />BUREAU OF LAND MANAGEMENT <br />Grand Junction Field Office <br />2815 H Rd <br />Grand Junction, Golorado 81506 <br />CO-130 (3809) www.co.blm.gov/gjre/gjra.btml <br />~~ <br />'R~~. <br />TAKE PRIDE' <br />~NAMERIC:A <br />RECEIVED <br />NOV 0 2 2007 <br />Frank Filas <br />Energy Fuels Corporation / <br />44 Union Blvd„ Suite 600. <br />Lakewood, CO 80228 ' / <br />Re: Plan of Operations " / <br />Whirlwind Mine /~ / <br />M-3~n7 -o~/~( <br />Dear Mr. Filas: <br />October 17, 2007 <br />RECEIVED <br />OCT 2 32007 <br />GRAND JUp1 ISION OFD OFFICE <br />RECIANIATION MINING & SAFETY <br />Division of Reclamation, <br />Mining and Safety <br />1/ <br />This office received the Plan of Operations (PO) for the Whirlwind Mine on July 5, 2007. <br />The PO proposes to expand the existing Whirlwind Tunnel and Packrat Mine into a <br />combined underground uranium operation called the Whirlwind Mine. <br />Based on our review under the BLM surface management regulations at 43 CFR <br />3809.401, we have determined that additional information must be submitted in order to <br />make the PO adequate and complete. Please respond to the items below by providing an <br />explanation and/or replacement updated section(s) of the PO. Also identify where the <br />changes were made. <br />1. Freshwater source {Page 5-23). This indicates the freshwater source would be nearby <br />springs or wells. However, the recent bulk sampling NOI says DP Spring will not be <br />used. Specify your likely freshwater source. <br />2. Water treatment updates (various pages) -Update the PO to be consistent with <br />changes made in the recently approved Whirlwind NOI modification, specifically related <br />to changes in the design of water treatment facility, storage capacity, selenium treatment, <br />and surface facilities (structures). <br />3. Bulkhead seals (Page 6-5). This addresses the proposed upper and lower bulkhead <br />seals, but does not include any bulkhead design. Provide a conceptual design with <br />illustrations as appropriate. <br />4. Bonding (Page 6-11). The bond needs adjusted for removal of metal tanks rather than <br />pond backfill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.