Laserfiche WebLink
iiiiiiiiiiiiiiuiii <br />999 <br />• ~S sus <br />COlP01iZ~i0/L <br />Intsrorganlzat(on Correspondence <br />Dete: September 30, 19$1 <br />70: Mr. Carl 'rJinter^ <br />Mr, Randy lJatts <br />From: Plike Spencer <br /> <br />w/`~~-~ <br />Su6Ject: Water monitoring well <br />During September 25-29, 19$1 Kissner Drilling Company estRblished <br />a water well in Hubbard Creek c-nyon for U.S.S..Atining Company. <br />Below is a description of the work performed by Kissner Drilling <br />Company: <br />September 25, 19$1 <br />Drilled to the 50 ft. level and installed steel casing. <br />Arrived at job site at 10:30 a,m. <br />Began ~3rilling at 11:30 a,m. <br />• Stopped drilling st 2:30 p.m. (Drill mud had to be transported <br />to the job site) <br />September 28, 1981 <br />Drilled to the 95 ft. level and began perforated casing installation. <br />Arrived et job site at 9:x+5 a,m. <br />Began mixing mud at 10:15 a.m. <br />Began drilling at 1~;~~~ a,m. <br />Began casing installation at approximately 3:00 p,m, <br />(The casing could only be installed to 25 ft. because the <br />hole was plugged. The well had to be stabilized before <br />the casing installation could be completed,) <br />Departed from job site at approximately 5:00 p.m. <br />September 29, 14$1 <br />Completed the well. <br />Arrived and began well stabiliz=tion ,t 10:30 e.m, (The <br />well wag stabilized by reaming the hole with a rod that <br />had steel slats welded the length of the rod, and pumping <br />heavier mud through the hole.) <br />. Began well development ahd gavel packing at 12:00 p.m, <br />Departed from job site at 2:30 p,m, <br />