Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />E~~ NEC.4 <br />S Coal Company Seneca Coal Company <br />RECEIVED <br />JAN 3 0 1998 <br />Division o(Minerals 8 Geobpy <br />January 26, 1998 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the fourth quarter stockpond inspections <br />for those structures at Seneca II which have been constructed to <br />date. The 'as-built' certifications for those stockponds which <br />do not already have an existing 'as-built' report or which have <br />been modified from the original will be submitted with the 1997 <br />Annual Reclamation Report. Most of the stockponds appeared <br />stable and acceptable. Several have filled with sediment from <br />the storms we had in September. We will clean these stockponds <br />out in the spring when the weather and ground conditions allow. <br />Should you have any questions, please do not hesitate to call. <br />--..._,. <br />Vic. ':: .. <br />G. Altav <br />Enclosure(s) <br />Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />P.E. <br />JAN 2 6 1998 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />