Laserfiche WebLink
1 <br />T � • <br />WANED LANs,,_. <br />Department 01 Natural Reso� , <br />1313 Sherman St., Room 215 ` <br />Denver. CO 80203 <br />303 866 -3567 <br />FAY 303 832 -8106 <br />May 24, 1990 <br />Mr. Stevan O'Brian <br />Environment, Inc. <br />9989 West 60th Avenue <br />Arvada, CO 80004 <br />Re: M -86 -104, Montgomery Pit, Permit Issuance <br />Dear Mr. O'Brian: <br />/6'!6 <br />Fo Ra <br />Goverm <br />Fred R Banta. <br />Pvison D re of <br />On May 24, 1990, the Mined Land Reclamation Division found B & B Excavating, <br />Inc. to have satisfied the applicable requirements of C.R.S. 34 -32 -101 et seq. <br />for obtaining a mining and reclamation permit. Therefore, a permit is wing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none has been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and /or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />On your permit anniversary data each year, May 24, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$350.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34 -32- 11611) (a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, 7 <br />.i <br />FRED R. BANTA <br />Director <br />RB /dlm <br />Enclosure <br />1,591G <br />