Laserfiche WebLink
~~ <br />III IIIIIIIIIIIII III <br />• <br />J <br />MINED LAND ~., <br />Department of Natural Resow. <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />Fq X. 303 632-8106 <br />04 CpC~ <br />1W~ T oo <br />„<~~. <br />~O <br />vr./. <br />•.~i. <br />+876 ~ <br /> <br />Roy Romer, <br />Governor <br />March 26 , 1990 Fretl R. Banta <br />Division D~recto• <br />Mr. Mark A. Heifner <br />37 E. Colorado Avenue <br />Denver, CO 80210 <br />Re: M-89-116, Crystal Pit, Permit Issuance <br />Uear Mr. Heifner: <br />On March 26, 1990, the Mined Land Reclamation Division found City of Colorado <br />Springs to have satisfied the applicable requirements of C. R, S. 34-32-101 et <br />seq. for obtaining a mining and reclamation permit, Therefore, a permit is <br />being issued. Two signed originals of the Dermit have been executed. We have <br />Kept one copy for our files and are enclosing one copy for your use. Please <br />read the terms of the permit. It is your responsibility to comply with all of <br />the terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1, All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the Dermit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2, Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minera75 Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary, Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1,10 to Conversions, <br />3. On your permit anniversary date each year, March 26, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />b50.00, Please consult Rule 3.4 for 110 Permits, and Rule 2,4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine, <br />If you have any questions, please contact me. <br />S?nc re <br />i . <br />~ i <br />FR D R. <br />Director J <br />Enclosures <br />6616G <br />