Laserfiche WebLink
III~II~I99IIIIlI~II . <br />STATE OF COLORADO <br />DIVISION Of MINERALS AND GEOLOGY <br />Drparlmem nl N,itural Resu~rces <br />I I L{ Shaman tit.. Rnum ? 15 <br />Denver, G,Iur.iJu NO'I~l <br />I'I a ux•. 1411 { ~ 74fiL- { 51, 7 <br />FAX I1U 11aT2-K 111(, <br />August 4, 1998 <br />Mr. James H. Kirkland <br />Kirkland Construction, RLLP <br />2101 Mian Street <br />P.O. Box 580 <br />Rye, CO 81069 <br />RE: Two Rivers, M-98-038, Permit Issuance -Construction Material Operation <br />Dear Mr. Kirkland: <br />DEPAR'F[vIENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Guvema <br />IamesS lcxhhead <br />f.aecmive Dueuor <br />Michael 8. Lon;; <br />DiVI$inn Director <br />On August 03, 1998 the Division of Minerals and Geology found Kirkland Construction, RLLP to have <br />satisfied the applicable requirements of C.R.S. 34-32.5-101 et seg. for obtaining a mining and reclamation <br />permit. Therefore, a permit is being issued. Two signed originals of the permit have been executed. We <br />have kept one copy for our files and are enclosing one copy for your use. It is your responsibility to comply <br />with all of the terms of the permit. <br />I. All of the original application materials, as amended and supplemented, aze an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of <br />all of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a <br />copy of the permit and the permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains <br />to Amendments, Rule 1.9 to Technical Revisions, and Rule 1.1 I to Conversions. <br />3. On your permit anniversary date each year, August 3, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $550.00. Please consult the Ac[, Rules and Regulations, and <br />your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />~Sincerel^'\~ <br />MICHAEL B. LON~ <br />Division Director <br />MBL/BMK/SME <br />