My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65845
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:51 PM
Creation date
11/20/2007 9:04:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982112
IBM Index Class Name
Permit File
Doc Date
2/1/1983
Doc Name
MINING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RK~IVED <br />~II ~I~~I~~II~~~~II~ • <br />999 FEB ~ 11983 <br />MINED LAND RECLAMATION <br />MINING= PLAN COLO. DEPT. OF NATURAL RESOURCES <br />A. Mining operations wi].1 commence on the west side of the proposed <br />mined property. It is contemplated that mining operations will <br />be conducted in ~ northeasterly direction in approximately 10 acre <br />partials with the reclamation activities being conducted as the <br />mining is in progress. <br />Thy operator anticipates mining approximetely 3 to 10 acres per <br />year end the anticipated life of the mining operation is twenty <br />years. <br />The method of mining will be open pit with utilization of <br />front-enf loader, b~ckhos, rocker end screener for processing the <br />gravel. Earth movin¢ equipment include scrapers, front end loader, <br />bulldozers and graders for removal of overburden stockpiling of <br />same and extraction of gravel. Screening plant will be constructed <br />in the area mined end the effected area will be limited to the <br />56.13 acres. The mining operation and screening plant will be <br />constructed as ?oon es permits are obteine~. The screen plant is <br />a move-in portable type and should be operational in a few days. <br />Topsoil and overburden will be stockpiled within the mine arse on <br />the north border and.sovthuest corner of the mini site. Reclamation <br />activities will be conducted cooperatively with mining operations <br />If in the future, the operator desires to add to the operation, an <br />asphaltic hot plant or concrete batch plant, or both, then they will <br />by technical revision, legally request that such a modification to <br />the operating permit be considered. <br />
The URL can be used to link to this page
Your browser does not support the video tag.