My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27982
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:19 PM
Creation date
11/20/2007 8:44:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
4/11/2005
Doc Name
March 2005 Monthly Report
From
Battle Mountain Resources Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />April 08, 2005 <br />Mr. Tony Waldron <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2005 Monthly Report <br />R~1.r~'VC~ <br />APR 1 12005 <br />11iY1FlBf141 Minerals and G6010g1j <br />Dear Mr. Waldron: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of March 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(Q~QC) Plan. <br />Vacuum on the tailing lysimeters was verified on March 31n, no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers on <br />March 31~', the West Pit and tailings embankment monitoring wells were collected on March <br />31". The March 31" tailing impoundment piezometer measurements identified these installations <br />were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on March <br />31 ".The March tailings pond underdrain flow average was 40.68 gpm and a total of 680 gallons <br />of water was excavated from the leak detection system yielding a monthly average of 22 gpad. <br />During March, the West Pit water treatment plant operated efficiently discharging a total of <br />9,440,700 gallons (28.97 acre-feet) of water to Rito Seco Creek and a total of 803,800 gallons <br />(2.47 acre-feet) of water was transfen•ed from the water Vestment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for March was .50" inches, with the lazgest accumulation occurring on <br />March 31" (.12"). <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.