Laserfiche WebLink
T '.~ • <br />PROJECT IDENTIFICATION <br />Date: 12-Dec-2001 <br />User: WHE <br />III IIIIIIIII IIII III • <br />CIRCES Cost Estlmat;,:_ ..~ .ware <br />COST SUMMARY FORM <br />Permit or job no.: M-1991-146 Site : Zmk Grai <br />Abbreviation : none State :Colorado <br />Filename : M146-000 County : Ouray <br />I O1 ~~ <br />Agency or organization name : DIR1G <br />Permit or job action :General 110c bond review <br />TASK LIST (DIRECT COSTSI ~ FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Rough grade pit and inslopes, ensure 3H:1V, breach berm dozer 1 14.02 $1,616 <br /> <br />002 -Close breach in historic flood protection dike dozer 1 2.1 $133 <br /> <br />003 -Transplant 24 cottonwoods revege 1 8.0 $128 <br /> <br />004 -Haul reclamation equipment to and from job site mobilize 2 2.6 $66J <br /> <br />005 -Remove mist debris, 20'L • 10'W • 5'H @ $0.22/c( NA 1 4.0 $220 <br /> <br /> <br /> <br /> <br /> ' <br /> J <br />. <br /> <br /> <br /> <br /> /-' <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 30.8 $2,784 <br />includes inllalion factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />not required (or eqp. operator serves as super) <br />1.55 <br />1.05 <br />NA• <br />10.00 <br />TOTAL DIRECT COST= $2,784 <br />of direct total = $43 <br />of direct total = $29 <br />NA NA total = NA <br />o(direct total = $278 <br /> TOTAL O b P = $351 <br />CONTRACT AMO UNT (direct . O a P) _ $3,135 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $157 <br />CONTINGENCY- NA• NA total = NA <br />'contingencies accounted rorat task level ' TOTAL INDIRECT COST = $$Q8 <br /> <br />r TOTAL BOND AMOUNT (direct+ indirect) _ $3,292 <br /> <br />