Laserfiche WebLink
~~ iiiiiiiiiiiiiiuiii <br />999 <br />ECG NECA <br />S Coa/Company Seneca Coal Company <br />RECEIVED <br />MAR 13 2000 <br />Division of Minerals 8 Geology <br />March 7, 2000 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />1RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspections <br />Dear Mr. Boulay: <br />Enclosed are copies of the fourth quarter stockpond inspections <br />for those structures at Seneca II which have been constructed to <br />date. Most of the stockponds appeared stable and acceptable. <br />Some of the stockponds still require maintenance work to take <br />place. <br />Should you have any questions, please do nom-.1}e~tate to call. <br />~~s <br />~ti <br />Engi <br />Alt~.~~`'3~a, P.E. <br />Enclosure (s ) MAR 0 7 2000 <br />c: Dennis Jones (SCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />