My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64365
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:20 PM
Creation date
11/20/2007 8:23:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000149
IBM Index Class Name
Permit File
Doc Date
12/4/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />• ~II ~IIIII~I~~~~~~II <br />999 <br />Date : Oq-IRre~2000 Permit orjob no.: M-2000-149 Site :Todd Dysart Pit <br />User : ESC Abbreviation : none State :Colorado <br />Filename : M149-000 County :Logan <br />Agency or organization name :Division Of Minerals 8 Geology <br />Permit orjob action :New Permit Application <br />TASK LIST (DIRECT COSTS) <br />N0. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 '-Back/ill Slopes to 3hav ~ scraped 1 20.121 $4,039 <br />002 -Replace Topsoil scraped 1 15.26 $2,995 <br />003 -RevegetafeDisturbedArea revege 1 20.0 $4,346 <br />004 -Mob/Demob mobilize 1 3.3 $1,051 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS' 58.71 $12,431 <br />• inGudes inflation (actor adjustment or: NA % TOTAL DIRECT COST' =i $12,769 <br />:CT COSTS <br />OVERHEAD AND PROFIT Liability InSUranCe : 1.55 % of direct total = $198 <br />Performance bond : 1.05 % of direct total = $134 <br />Job superintendent : NA' NA NA total = NA <br />Profit: 10.00 %ofdirect total= $1,277 <br />• not requires (or eqp operator serves as super.) TOTAL O 8 P = $1, 609 <br /> CONTRACT AMOUNT (OireIX+08 P)= $14,378 <br />PROJECT MANAGEMENT <br />Engineering work and/or contract bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $719 <br />CONTINGENCY- NAB NA total= NA <br />'contingences accountetl for at task level TOTAL INDIRECT COST = $2,328 <br />TOTAL BOND AMOUNT (direct+ indirect) = 515,097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.