Laserfiche WebLink
Q.~,D <br /> <br />BATTLE MOUNTAIN RESOURCES, INC. <br />May 09, 2006 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />tl~pril 2006 Monthly Report <br />Dear Mr. Sorensen: <br />MAY 11 ~ <br />~SIUg g ~ Ninety): and Geology <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMR[), San Luis Project for the month of April 2006. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(Q~QC) Plan. <br />Vacuum on the tailing lysimeters was verified on April 26`", no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells on Apri127'". April tailing impoundment <br />piezometer measurements identified these installations were either dry or contained less than 12 <br />inches of water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water <br />measurements collected for each of the site monitoring wells, piezometers and lysimeters as <br />required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on April <br />26`". The April tailings pond underdrain flow average was d3.46 gpm and a total of 780 gallons of <br />water was excavated from the leak detection system yielding a monthly average of 27.86 gpad. <br />During April, the Wes[ Pit water treatment plant operated efficiently discharging a total of <br />7,522,500 gallons (23.09 acre-feet) of water to Rito Seco Creek and a total of 543,000 gallons <br />(l .67 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />