Laserfiche WebLink
3 - al <br />Lodestar Energy, Inc. 999 <br />POND INSPECTION REPORT McCLANE CANYON MINE <br />24-Aug-01 C-004-80 <br />OPERATIONAL STATUS AT TIME OF INSPECTION <br />SEDIMENT SAE 1 SAE 2 SAE 3 <br />POND OFFICE TOPSOIL RIP-RAP <br />APPROXIMATE WATER LEVEL <br />SEDIMENT LEVEL <br />OUTFLOW (cfs ) <br />full -35% --27% -27% <br />unknown <25% <25% <25% <br />100 r stm. 0.0 0.0 0.0 <br />FEATURES <br />EROSIONAL <br />RILLS & GULLIES ON EMB <br />INADEQUATE VEGETATION <br />OUTLET CHANNEL EROSION <br />BURROWS <br />OTHER <br />not ma'or NO NO NO <br />O.K. NO NO NO <br />O.K. NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />STRUCTURAL <br />DIFFERENTIAL SETTLING <br />CRACKS OR SLIDES <br />SEEPAGE <br />OTHER <br />APPURTENANT STRUCTURES <br />DEFECTIVE SPILLWAYS <br />DEWATERING DEVICE CLOGGED <br />FAULTY GATES, BAFFLES <br />OTHER <br />NO NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />NO NO NO NO <br />ADDITIONAL COMMENTS August 21, 2001- 100 year 6 hour event occurred in afternoon. <br />drop culvert above fan plugged and flooded shop area. Sediment <br />pond filled and discharged. Entire mine site requires substantial <br />cleanup. <br />MAINTENANCE REQUIRED yes yes yes yes <br />INSPECTOR gbh / D. Mathews <br />