Laserfiche WebLink
in co~.Pr-et~ss / <br />STATE OF COLORADO <br />DIVISION Of MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX; (303) 832-8106 <br />December 9, 2002 <br /> <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill ovens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Ronald W. Cattany <br />Acting Division Direcror <br />Mr, Joe Gagliano <br />L.J. Development, Inca <br />159 Tiffany Ct. <br />Pueblo, CO 81005 <br />Re: Velazde Pit, File No. <br />Application Pacltage <br />Deaz Mr. Gagliano: <br />On December 3, 2002, the Division of Minerals and Geology received your 112 Construction Materials <br />Reclamation Permit Application package for the Velarde Pit, File No. M-2002-118. Preliminary review of the <br />information received detemuned that the following items must be received before the Division can consider your <br />application as being submitted and technical review can begin: <br />EXHIBIT G -Water Information (Rule 6.4.71: (1) If the operation is not expected to directly affect <br />surface or groundwater systems, a statement of that expectation shall be submitted. <br />(2) If the operation is expected to directly affect surface or groundwater systems, you shall: <br />{a) Locate on the map (in Exhibit C) tributary water courses, wells, springs, stock water <br />ponds, reservoirs, and ditches on the affected land and on adjacent lands where such stmctures may be <br />affected by the proposed mining operations; <br />(b) Identify all known aquifers; and <br />(c) Submit a brief statement or plan showing how water from dewatering operations or <br />from runoff from disturbed azeas, pIled material and operating surfaces will be managed to protect <br />against pollution of either surface or groundwater (and, where applicable, control pollution in a manner <br />that is consistent with water quality discharge permits), both during and after the operation. <br />(3) You must provide an estimate of the project water requirements including flow rates and annual <br />volumes for the development, mining and reclamation phases of the project. <br />(4) You must indicate the projected amount from each of the sources of water to supply the project <br />water requirements for the mining operation and reclamation. <br />M-2002-118, Receipt of 112 Construction Materials Reclamation Permit <br />(5) You must affirmatively state that the Operator/Applicant has acquired (or has applied for) a <br />National Pollutant Dischazge Elimination System (NPDES) permit from the Water Quality Control <br />