Laserfiche WebLink
uiiiiii <br />i <br />. ii iiiiiii <br />i <br />~ STATE OF COLORP~DO <br />Roy Romer, Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />August 31, 1987 <br />John Dillon <br />Sandco, Inc. <br />P. 0. Box 1773 <br />Durango, CO 81302 <br />Re: M-87-044 Walker Pit, Permit Issuance <br />Dear Mr. Dillon: <br />On August 27, 1987, the Mined Land Reclamation Division found Sandco, Inc. to <br />have satisfied the applicable requirements of C.R.S. 34-32-101 et seq. for <br />obtaining a mining and reclamation permit. Therefore, a permitis~eing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. Asa reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none has been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2: Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1:9 to Technical Revisions, and Rule 1:10 to Conversions. <br />3. On your permit anniversary date each year, August 27, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />E50.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me: <br />Sincer ly, ~ ~~ <br />J DAYID HOLM <br />cting Director <br />DCS/ <br />Enclosure <br />4839G <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />